Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 5, York South-Weston

213 Bicknell Ave

The City of Toronto has 5 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal to construct a 2nd floor addition above the garage and interior alterations to the garage to add 2 additional units to the existing detached dwelling.

    Applied Jul 7, 2026 · issued Jul 29, 2026 · Permit 24 189990 HVA

    Permit issued
  • Plumbing

    Plumbing - Proposal to construct a 2nd floor addition above the garage and interior alterations to the garage to add 2 additional units to the existing detached dwelling.

    Applied Jul 7, 2026 · issued Jul 31, 2026 · Permit 24 189990 PLB

    Permit issued
  • Small residential project · Multiple projects

    Proposal to construct a 2nd floor addition above the garage and interior alterations to the garage to add 2 additional units to the existing detached dwelling.

    Applied Jul 30, 2024 · issued Dec 9, 2025 · 2 homes added · Permit 24 189990 BLD

    Inspections under way
  • Small residential project · Accessory Building(s)

    CONSTRUCT A GARDEN SHED 5.08 m x 4.28 m IN REAR YARD

    Applied Oct 13, 2020 · issued Oct 26, 2020 · Permit 20 205874 BLD

    Inspections under way
  • Small residential project · Garage

    Proposal to construct an attached garage addition,

    Applied May 11, 2018 · issued Jul 6, 2018 · Permit 18 156910 BLD

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To legalize and maintain the existing rear shed.

    Decision: Approved (hearing Sep 15, 2020)

    Filed Jun 25, 2020 · File A0248/20EYK

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 59 Yarrow Rd · Minor variance

    To legalize and to maintain the existing detached garage and to construct a new one storey addition along the front of the detached garage in order to accommodate a new garden suite.

    150 m away · filed Jul 2, 2026 · Deferred

  • 1785 Keele St · Minor variance

    To construct a new apartment building containing a total of six dwelling units.

    200 m away · filed Jun 24, 2026 · Approved

  • 9 Hertford Ave · Minor variance

    To construct a new semi-detached fourplex with a garden suite in the rear yard.

    130 m away · filed Feb 6, 2026 · Refused

  • 9 Hertford Ave · Minor variance

    To construct a new semi-detached fourplex with a garden suite in the rear yard.

    130 m away · filed Feb 6, 2026 · Refused

  • 9 Hertford Ave · Consent

    To obtain consent to sever the lot into two undersized residential lots, to construct a pair of semi-detached fourplexes with garden suites in the rear yards and to create an easement/right-of-way for the purpose of pedestrian access.

    130 m away · filed Feb 6, 2026 · Refused

  • 37 Juliet Cres · Minor variance

    To construct a new fourplex with a detached garage in the rear yard.

    200 m away · filed Aug 22, 2024 · Approved

  • 1971 Keele St · Minor variance

    240 m away · filed Jul 5, 2024 · Application withdrawn

  • 63 Yarrow Rd · Minor variance

    To construct a new triplex dwelling.

    150 m away · filed Nov 16, 2023 · Approved

Everything planned in York South-Weston

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.