Toronto address · Ward 9, Davenport
213 Sterling Rd
The City of Toronto has 29 building permits since 2017 (16 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Addition or alteration · Interior alterations
REVISION - remove concrete lintel and addition of a demising wallProposed door replacement at south elevation.
Applied Mar 14, 2025 · issued Apr 9, 2025 · Permit 24 219154 BLD (revision 01)
- Inspections under way
Addition or alteration · Interior alterations
Proposed door replacement at south elevation.
Applied Sep 27, 2024 · issued Oct 29, 2024 · Permit 24 219154 BLD
- Inspections under way
Addition or alteration · Interior alterations
Proposal to replace/ restore second storey windows.
Applied Jul 11, 2024 · issued Aug 27, 2024 · Permit 24 178605 BLD
- Closed
Addition or alteration · Interior alterations
Revision 01- to modify existing sprinkler system for Suite 214 - Influence Agency
Applied Feb 4, 2022 · issued Mar 9, 2022 · completed Apr 25, 2023 · Permit 21 134996 BLD (revision 01)
- Inspections under way
Heating and ventilation
HVAC - Alterations to offices on second floor and mezzanine for Suite 214 - Influence Agency
Applied Apr 1, 2021 · issued Jun 4, 2021 · Permit 21 134996 HVA
- Inspections under way
Plumbing
Plumbing - Alterations to offices on second floor and mezzanine for Suite 214 - Influence Agency
Applied Apr 1, 2021 · issued Jun 4, 2021 · Permit 21 134996 PLB
- Closed
Addition or alteration · Interior alterations
Alterations to offices on second floor and mezzanine for Suite 214 - Influence Agency
Applied Apr 1, 2021 · issued Jun 4, 2021 · completed Apr 25, 2023 · Permit 21 134996 BLD
- Inspections under way
Addition or alteration · Other
Proposal for interior alterations and a new exterior canopy on the north elevation of an existing commercial building.
Applied Feb 25, 2020 · issued May 5, 2020 · Permit 20 119045 BLD
- Revision issued
Addition or alteration · Interior alterations
REV01: changes as per drawings
Applied Oct 15, 2019 · issued Nov 4, 2019 · Permit 18 182841 BLD (revision 01)
- Inspections under way
Plumbing
Plumbing - Proposal for interior alterations for office from existing vacant space.
Applied Aug 15, 2019 · issued Nov 19, 2019 · Permit 19 205841 PLB
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations for office from existing vacant space.
Applied Aug 14, 2019 · issued Nov 19, 2019 · completed Mar 10, 2020 · Permit 19 205841 HVA
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations for office from existing vacant space.
Applied Aug 14, 2019 · issued Nov 19, 2019 · Permit 19 205841 BLD
Show 17 more permits
- Permit issued
Heating and ventilation
HVAC - Proposal for interior alterations to existing vacant commercial space on the 2nd floor for new photography studio - UNIT 212
Applied Aug 13, 2019 · issued Sep 9, 2019 · Permit 19 204965 HVA
- Permit issued
Plumbing
Plumbing - Proposal for interior alterations to existing vacant commercial space on the 2nd floor for new photography studio - UNIT 212
Applied Aug 13, 2019 · issued Sep 9, 2019 · Permit 19 204965 PLB
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to existing vacant commercial space on the 2nd floor for new photography studio - UNIT 212
Applied Aug 13, 2019 · issued Sep 9, 2019 · completed Dec 9, 2019 · Permit 19 204965 BLD
- Inspections under way
Heating and ventilation
HVAC - Proposal for interior alterations to existing office space located in Suite 203
Applied Aug 1, 2019 · issued Sep 3, 2019 · Permit 19 199217 HVA
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to existing industrial space for new restaurant (136.26 sq. metres), greater than 30 seats (39 seats) - UNIT 104, "Ethica Roasters"
Applied Aug 1, 2019 · issued Sep 6, 2019 · completed Oct 23, 2020 · Permit 19 199428 BLD
- Closed
Plumbing
Plumbing - Proposal for interior alterations to existing industrial space for new restaurant, greater than 30 seats (39 seats) - UNIT 104, "Ethica Roasters"
Applied Aug 1, 2019 · issued Sep 6, 2019 · completed Oct 22, 2020 · Permit 19 199428 PLB
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to existing suite located in Suite 203Proposed: software design and development establishment
Applied Aug 1, 2019 · issued Aug 13, 2019 · completed Oct 13, 2021 · Permit 19 199217 BLD
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to existing industrial space for new restaurant, greater than 30 seats (39 seats) - UNIT 104, "Ethica Roasters"
Applied Aug 1, 2019 · issued Sep 6, 2019 · completed Oct 22, 2020 · Permit 19 199428 HVA
- Closed
Fire and security upgrade
FS - Sprinkler Shop Drawing - Proposal for interior alterations to an existing industrial building to create a mezzanine and 2nd floor within void space inside the building. Proposed use for new space is artist's studios.See also 18 112788 ZZC.
Applied Jul 19, 2018 · completed May 24, 2019 · Permit 18 182841 FSU
- Inspections under way
Heating and ventilation
HVAC - Proposal for interior alterations to an existing industrial building to create a mezzanine and 2nd floor within void space inside the building. Proposed use for new space is artist's studios.See also 18 112788 ZZC.
Applied Jun 22, 2018 · issued Aug 2, 2018 · Permit 18 182841 HVA
- Inspections under way
Plumbing
Plumbing - Proposal for interior alterations to an existing industrial building to create a mezzanine and 2nd floor within void space inside the building. Proposed use for new space is artist's studios.See also 18 112788 ZZC.
Applied Jun 22, 2018 · issued Aug 2, 2018 · Permit 18 182841 PLB
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations to an existing industrial building to create a mezzanine and 2nd floor within void space inside the building. Proposed use for new space is artist's studios.See also 18 112788 ZZC.
Applied Jun 22, 2018 · issued Aug 2, 2018 · Permit 18 182841 BLD
- Closed
Addition or alteration · Interior alterations
Revision #-01 installation of rigging to support lighting for unit 102.Proposal for interior alterations unit 102 to create an art studio in existing industrial building
Applied Jun 4, 2018 · issued Jun 5, 2018 · completed Jun 14, 2018 · Permit 18 159298 BLD (revision 01)
- Permit issued
Plumbing
Plumbing - Proposal for interior alterations unit 102 to create an art studio in existing industrial building
Applied May 25, 2018 · issued May 28, 2018 · Permit 18 159298 PLB
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations unit 102 to create an art studio in existing industrial building
Applied May 15, 2018 · issued May 28, 2018 · completed Jun 11, 2018 · Permit 18 159298 HVA
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations unit 102 to create an art studio in existing industrial building
Applied May 15, 2018 · issued May 16, 2018 · completed Jun 14, 2018 · Permit 18 159298 BLD
- Closed
Addition or alteration · Window replacement
Applicant proposed window replacement with doors on the south east corner of the building
Applied Jul 14, 2016 · issued Jul 25, 2016 · completed Dec 22, 2017 · Permit 16 190381 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
13 storeys · Mixed use
130 m away · Site plan · Under review · filed Apr 22, 2022
- Under review
31 storeys · 388 homes · Mixed use
140 m away · Site plan · Under review · filed May 30, 2024
- Under review
11 storeys · Non-residential
140 m away · Site plan · Under review · filed Aug 15, 2022
- Under review
33 storeys · 634 homes · Mixed use
240 m away · Site plan · Under review · filed Aug 30, 2021
- Under review
19 storeys · 325 homes · Mixed use
250 m away · Condominium · Under review · filed Nov 8, 2021
- Under review
21 storeys · 861 homes · Residential
290 m away · Site plan · Under review · filed Nov 7, 2024
Neighbours’ Committee of Adjustment files within 250 m
462 Lansdowne Ave · Minor variance
To legalize and to maintain the front one-storey addition (front porch enclosure) with stairs of the existing two-storey semi-detached dwelling, that was constructed without an authorized building permit.
250 m away · filed Mar 20, 2026 · Postponed
1319 Bloor St W · Consent
To obtain consent to sever the property into two mixed-use lots and to create new easements/rights-of-way.
220 m away · filed Sep 3, 2025 · Approved
1319 Bloor St W · Minor variance
To permit the construction of the Bloor Lansdowne SmartTrack GO Station, which consists of the main entrance building (municipally known as 1325 Bloor Street West), and a maintenance building with bicycle parking, and a partially enclosed waste and recycling storage area (municipally known as 17 Dora Avenue). The station also includes a West Access Building as well as other station elements (including the platforms, waiting enclosures, a pedestrian tunnel to access the westerly platform, stairs and elevators) will be located within the rail corridor and not part of the subject lands (municipa…
220 m away · filed Apr 2, 2025 · Approved
181 Sterling Rd · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 943-2015 (OMB), for a new 17-storey mixed-use building with 266 dwelling units, 2 retail units and 84 parking spaces within 2 levels of below grade garages (Block 4B) which is currently under construction, by reducing vehicular parking space sizes (length and width).
70 m away · filed Jan 24, 2025 · Approved
1319 Bloor St W · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 589-2022) for a 31-storey and 35-storey mixed-use building, by permitting an increase in building height and total gross floor area, and to modify the building envelope (setbacks and step-backs). There will be a total of 1,100 residential dwelling units on this lot.
220 m away · filed Aug 16, 2024 · Approved
230 Sterling Rd · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a rear two-storey addition. The existing rear basement walkout stairs, rear ground floor concrete pad, and a portion of the rear ground floor deck will be demolished.
150 m away · filed Aug 1, 2024 · Approved
59 Perth Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a partial third storey addition (within the attic), a rear two-storey addition with a second storey balcony and a rooftop deck (accessed from the third storey). There will be two residential dwelling units on this lot.
240 m away · filed Jan 8, 2024 · Approved
181 Sterling Rd · Minor variance
To alter the development standards, as approved under Site Specific Zoning By-law 943-2015 (OMB), which include adding an additional storey, changes to the overall height, setbacks, and parking standards, for the approved 16-storey mixed-use building (currently under construction).
70 m away · filed Aug 14, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.