Toronto address · Ward 6, York Centre
2133 Jane St
The City of Toronto has 14 building permits since 2017 (7 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Plumbing
Plumbing - Proposal for interior alterations to unit 5.
Applied Jul 17, 2026 · issued Jul 20, 2026 · Permit 26 184752 PLB
- Permit issued
Addition or alteration · Interior alterations
Proposal for interior alterations to unit 5.
Applied Jun 15, 2026 · issued Jul 15, 2026 · Permit 26 184752 BLD
- Closed
Plumbing
Plumbing - Proposal for Interior Reno to Units 1 and Unit 6
Applied Jun 11, 2025 · issued Jul 2, 2025 · completed Nov 27, 2025 · Permit 25 166178 PLB
- Inspections under way
Addition or alteration · Interior alterations
Proposal for Interior Reno to Units 1 and Unit 6
Applied May 27, 2025 · issued Jun 11, 2025 · Permit 25 166178 BLD
- Cancelled
Addition or alteration · Interior alterations
Proposed interior alterations to convert unit 5 into 2 units (5A & 5B). The existing mixed-use building will have a total of 7 residential apartments instead of 6.
Applied May 23, 2024 · completed Feb 25, 2026 · 1 home added · Permit 24 153266 BLD
- Permit issued
Addition or alteration · Interior alterations
Proposed interior alterations to the residential unit on the second floor. *Unit 6*
Applied Oct 4, 2023 · issued Oct 27, 2023 · Permit 23 210865 BLD
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations in Unit 2 located on the second floor of the existing mixed used building.
Applied May 18, 2023 · issued Jun 19, 2023 · Permit 23 147565 BLD
- Inspections under way
Plumbing
Plumbing - Proposed interior alterations to units 3 and 4
Applied Mar 23, 2023 · issued Mar 27, 2023 · Permit 22 230718 PLB
- Inspections under way
Addition or alteration · Interior alterations
Proposed interior alterations to units 3 and 4
Applied Nov 17, 2022 · issued Mar 21, 2023 · Permit 22 230718 BLD
- Closed
Plumbing · Backflow prevention devices (Water only)
Proposed to install backflow preventer.
Applied Mar 22, 2018 · issued Apr 16, 2018 · completed May 14, 2018 · Permit 18 132879 PSA
- Cancelled
Plumbing
Plumbing - Minor interior alterations to existing sushi restaurant - "Sushi".
Applied Jan 29, 2013 · issued Jul 2, 2013 · completed Oct 20, 2025 · Permit 13 112875 PLB
- Cancelled
Addition or alteration · Interior alterations
Minor interior alterations to sushi restaurant - "Sushi".
Applied Jan 29, 2013 · issued May 29, 2013 · completed Oct 20, 2025 · Permit 13 112875 BLD
Show 2 more permits
- Closed (dormant)
Heating and ventilation · Special ventilation system
Kitchen Exhaust - St. Pio Bakery, Unit 3A
Applied Dec 5, 2008 · issued Jan 9, 2009 · completed Jun 8, 2026 · Permit 08 227771 MSA
- Closed (dormant)
Plumbing · Fixtures/Roof Drains: other
Unit 4-5 - Install one handsink in existing bakery shop
Applied Dec 5, 2008 · issued Jan 7, 2009 · completed Jun 8, 2026 · Permit 08 227763 PSA
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
Interior alterations to the second floor to convert 6 dwelling units to 12 units.
Decision: Approved (hearing Jun 20, 2019)
Filed Apr 13, 2019 · File A0285/19NY
What’s planned nearby
Development sites within 500 m
- Under review
2 storeys · Residential
310 m away · Site plan · Under review · filed Jan 15, 2025
Neighbours’ Committee of Adjustment files within 250 m
2090 Jane St · Minor variance
To make interior alterations to convert the existing building into a restaurant with a retail component (grocer).
160 m away · filed Mar 21, 2025 · Approved
1500 Wilson Ave · Minor variance
To construct a new canopy over the existing fuel pumps.
210 m away · filed Nov 24, 2017 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.