Toronto address · Ward 8, Eglinton-Lawrence
214 Fairlawn Ave
The City of Toronto has 6 building permits since 2017 (2 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Small residential project · Addition(s)
Revision #01 - Proposed changes to wall construction of front addition to brick veneer.PROPOSED REAR SECOND FLOOR ADDITION OVER FIRST FLOOR AND ENCLOSE FRONT VERANDAH
Applied Apr 2, 2024 · issued Apr 9, 2024 · Permit 24 103297 BLD (revision 01)
- Closed
Heating and ventilation
Hvac - proposed rear second floor addition over first floor and enclose front verandah
Applied Feb 1, 2024 · issued Feb 8, 2024 · completed Nov 13, 2024 · Permit 24 103297 HVA
- Inspections under way
Small residential project · Addition(s)
Proposed rear second floor addition over first floor and enclose front verandah
Applied Jan 10, 2024 · issued Jan 23, 2024 · Permit 24 103297 BLD
- Closed
Plumbing
Plumbing - Proposal to construct interior alterations and underpinning.
Applied Oct 20, 2023 · issued Oct 26, 2023 · completed Nov 13, 2024 · Permit 23 216833 PLB
- Closed
Small residential project · Multiple projects
Proposal to construct interior alterations and underpinning.
Applied Oct 20, 2023 · issued Oct 26, 2023 · completed Nov 13, 2024 · Permit 23 216833 BLD
- Closed
Drains and site services
Drain - Proposal to construct interior alterations and underpinning.
Applied Oct 20, 2023 · issued Oct 26, 2023 · completed Nov 13, 2024 · Permit 23 216833 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To enclose the existing front porch and construct a second storey addition at the rear of the existing semi-detached dwelling.
Decision: Approved (hearing Nov 9, 2023)
Filed Sep 29, 2023 · File A0522/23NY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
159 Brookdale Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a third-storey addition.
220 m away · filed May 5, 2026 · Approved
310 St Germain Ave · Minor variance
To construct a new two-storey detached dwelling, with rear deck and basement walkout. Please note, this application was previously deferred by the Committee of Adjustment on January 8, 2026.
220 m away · filed Nov 13, 2025 · Approved
136 Fairlawn Ave · Minor variance
To construct an addition to the rear of the existing semi-detached dwelling, in conjunction with legalizing the existing enclosed front porch. Please note, this application was previously deferred Thursday, February 20. 2025.
220 m away · filed Dec 31, 2024 · Approved
177 Brookdale Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a one-storey addition, a proposed two storey rear addition, and a proposed new shed.
190 m away · filed Dec 17, 2024 · Approved
269 St Germain Ave · Minor variance
To construct a new detached dwelling.
100 m away · filed Jul 11, 2023 · Approved
119 Melrose Ave · Minor variance
Proposal to construct a new three storey single family detached dwelling
220 m away · filed Jun 2, 2023 · Approved
261 St Germain Ave · Minor variance
Proposal to construct a new dwelling.
80 m away · filed Dec 23, 2022 · Approved
290 Fairlawn Ave · Minor variance
Proposal for a rear yard deck.
250 m away · filed Jul 19, 2022 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.