Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

214 King St E

The City of Toronto has 33 building permits since 2017 (10 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Interior alterations

    Proposal to construct interior alterations to an existing office space 202-214 KING STREET EAST (185 FREDERICK ST) - B101

    Applied Jan 30, 2024 · issued Feb 15, 2024 · Permit 24 109722 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to construct interior alterations to an existing office space 202-214 KING STREET EAST (185 FREDERICK ST) - B101

    Applied Jan 30, 2024 · issued Feb 23, 2024 · Permit 24 109722 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to an office unit 102, located on the first floor level for tenant - 'Canadian Premier League'. [Convenience address is 204 King St E.]

    Applied Feb 9, 2023 · issued Mar 7, 2023 · Permit 23 112066 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for interior alterations to existing office building. 2nd floor

    Applied Jul 3, 2020 · issued Aug 5, 2020 · completed Mar 19, 2021 · Permit 20 163043 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to existing office building. 2nd floor

    Applied Jul 3, 2020 · issued Aug 5, 2020 · completed Mar 19, 2021 · Permit 20 163043 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to the second floor of the existing office building.

    Applied Jul 3, 2020 · issued Jul 10, 2020 · completed Feb 12, 2021 · Permit 20 163043 BLD

    Closed
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Proposal to enclose 2nd and 3rd floors interconnected convenience stairs with 0 rated walls and add sprinkler coverage per mechanical sprinkler drawings.

    Applied Jan 2, 2020 · Permit 19 265030 FSU

    Application on hold
  • Addition or alteration · Interior alterations

    Proposal to enclose 2nd and 3rd floors interconnected convenience stairs with 0 rated glazed walls and add sprinkler coverage per mechanical sprinkler drawings and concept consistent with previous permits (Refer to 17 188990).

    Applied Dec 27, 2019 · issued Jan 9, 2020 · Permit 19 265030 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for interior alteration to the existing office space, 101.

    Applied Oct 29, 2019 · issued Nov 27, 2019 · completed Mar 4, 2020 · Permit 19 242580 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alteration to the existing office space, 101.

    Applied Oct 29, 2019 · issued Nov 27, 2019 · completed Feb 14, 2020 · Permit 19 242580 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alteration to the existing office space, 101.

    Applied Oct 29, 2019 · issued Nov 27, 2019 · completed Feb 11, 2020 · Permit 19 242580 BLD

    Closed
  • Addition or alteration · Interior alterations

    Interior alteration to the existing office space, B103.

    Applied Mar 14, 2019 · issued Apr 1, 2019 · completed Dec 3, 2019 · Permit 19 125819 BLD

    Closed
Show 21 more permits
  • Heating and ventilation

    HVAC - Interior alteration to the existing office space, B103.

    Applied Mar 14, 2019 · issued Apr 12, 2019 · completed Dec 6, 2019 · Permit 19 125819 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to existing office. unit B101

    Applied Dec 31, 2018 · issued Jan 16, 2019 · completed Jul 20, 2026 · Permit 18 272880 BLD

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to existing office. unit B101

    Applied Dec 31, 2018 · issued Jan 16, 2019 · Permit 18 272880 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal to renovate the washrooms on the 3rd floor - Suite 300

    Applied Jan 24, 2018 · issued Feb 7, 2018 · Permit 18 108924 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for interior alterations to the 6th floor of existing office.

    Applied Jan 23, 2018 · issued Feb 12, 2018 · completed Nov 22, 2018 · Permit 18 108551 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to the 6th floor of existing office.

    Applied Jan 23, 2018 · issued Feb 6, 2018 · completed Oct 26, 2018 · Permit 18 108551 BLD

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to the 6th floor of existing office.

    Applied Jan 23, 2018 · issued Feb 12, 2018 · completed Jan 2, 2026 · Permit 18 108551 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposal interior alteration of existing office of single-tenanted 6th floor: removal of non-load bearing walls to create open space office as well as the removal of the pre-action sprinkler system in the server room [AS].

    Applied Dec 8, 2017 · issued Jan 17, 2018 · completed Feb 13, 2018 · Permit 17 273430 BLD

    Closed
  • Addition or alteration · Interior alterations

    Back to base building - Interior demotition of partition walls, Suite 202.

    Applied Nov 21, 2017 · issued Dec 5, 2017 · completed Nov 27, 2025 · Permit 17 265347 BLD

    Closed
  • Addition or alteration · Interior alterations

    Revision # 02 - To the sprinklers for the 4, 5 and 6th floors of the existing multiple use building.REVISION 01 - ADD CARD READERS ON 4TH, 5TH AND 6TH FLOORSProposed interior alterations to existing commercial building (retail/office) to enclose interconnected interior stairwell on 4th and 6th.

    Applied Sep 18, 2017 · issued Sep 29, 2017 · completed Feb 20, 2018 · Permit 17 188990 BLD (revision 02)

    Closed
  • Addition or alteration · Interior alterations

    REVISION 01 - ADD CARD READERS ON 4TH, 5TH AND 6TH FLOORSProposed interior alterations to exising commercail building (retail/office) to enclose interconnected interior stairwell on 4th and 6th.

    Applied Aug 1, 2017 · issued Aug 4, 2017 · completed Feb 20, 2018 · Permit 17 188990 BLD (revision 01)

    Closed
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Proposed interior alterations to exising commercail building (retail/office) to enclose interconnected interior stairwell on 4th and 6th.

    Applied Jul 11, 2017 · completed Sep 7, 2017 · Permit 17 188990 FSU

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to the 4th floor in existing office - "Proofpoint"

    Applied Jun 29, 2017 · issued Jul 17, 2017 · completed Jan 16, 2018 · Permit 17 190190 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to the 4th floor in existing office - "Proofpoint"

    Applied Jun 29, 2017 · issued Jul 27, 2017 · completed Dec 7, 2017 · Permit 17 190190 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to the 4th floor in existing office - "Proofpoint"

    Applied Jun 29, 2017 · issued Jul 27, 2017 · completed Dec 1, 2017 · Permit 17 190190 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposed interior alterations to exising commercail building (retail/office) to enclose interconnected interior stairwell on 4th and 6th.

    Applied Jun 28, 2017 · issued Jul 12, 2017 · completed Feb 20, 2018 · Permit 17 188990 BLD

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to the 5th floor of the existing office building. Scope of work includes demo and construction of partitions, finishes and HVAC. Convenience address is 210 King St w.

    Applied Jun 15, 2017 · issued Jul 11, 2017 · completed Sep 5, 2017 · Permit 17 181156 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to the 5th floor of the existing office building. Scope of work includes demo and construction of partitions, finishes and HVAC. Convenience address is 210 King St w.

    Applied Jun 15, 2017 · issued Jul 17, 2017 · completed Sep 1, 2017 · Permit 17 181156 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to third floor office (221.1m2).

    Applied Feb 23, 2016 · issued Mar 17, 2016 · Permit 16 119550 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to third floor office (221.1m2).Convenience address: 210 King St E

    Applied Feb 23, 2016 · issued Mar 17, 2016 · Permit 16 119550 BLD

    Inspections under way
  • Fire and security upgrade · Electromagnetic locks

    Proposal to install one electromagnetic lock on the ground floor

    Applied Mar 27, 2015 · issued Apr 28, 2015 · Permit 15 133353 FSU

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 125 George St · Consent

    To obtain consent to create a new stratified easement/right-of-way.

    240 m away · filed Jun 2, 2026 · Hearing scheduled

  • 120 Front St E · Minor variance

    To alter the existing mixed-use building by designating 37 of the 43 non-residential parking spaces (located on the B-1 level) as a "Public Parking" use with the intent of permitting 20 of the 37 parking spaces to be leased as valet parking to a proposed hotel (municipally known as 197 King Street East) and the remaining 17 parking spaces to be rented to members of the public on a monthly basis.

    170 m away · filed Sep 15, 2022 · Approved

  • 164 Princess St · Minor variance

    To alter the existing four-storey detached office building by constructing a partial fifth floor sunroom addition.

    120 m away · filed Apr 29, 2022 · Approved

  • 125 George St · Consent

    To obtain consent to create a strata easement in favour of 109-117 George Street.

    240 m away · filed Jul 8, 2021 · Approved

  • 109 George St · Consent

    To obtain consent to sever for the purpose of a lot addition above 103.87.0 m (air rights) of the property municipally known as 109-117 George Street.

    190 m away · filed May 21, 2021 · Approved

  • 197 King St E · Minor variance

    To alter the existing 4-storey mixed-use building by constructing additions above and to the rear resulting in an 8-storey mixed use building containing a commercial restaurant use at the ground floor and basement with hotel suites above.

    110 m away · filed Oct 30, 2019 · Approved

  • 159 Frederick St · Minor variance

    To alter the 11-storey mixed-use building by converting a portion of the basement into office space.

    80 m away · filed Jun 12, 2019 · Approved

  • 120 Front St E · Minor variance

    To convert 41 existing underground parking spaces (currently designated for office use) to a commercial parking garage. There will be 90 parking spaces in total: 45 residential, 4 office, and 41 in the new commercial parking garage. No change to the built form is proposed.

    170 m away · filed Sep 15, 2017 · Withdrawn

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.