The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Installation of back water valve

    Applied Jun 8, 2020 · issued Jun 8, 2020 · completed Jan 22, 2026 · Permit 20 153508 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 12 Crewe Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear one-storey addition with an at-grade patio and pergola. Also, to construct a partial rear second storey addition, which will be cantilevered on the east side of the dwelling.

    160 m away · filed Apr 15, 2026 · Approved

  • 213 Gledhill Ave · Minor variance

    To construct a new three-storey detached dwelling (houseplex) with front and rear basement walkouts, a covered front porch with stairs, a rear partially covered ground floor deck, front and rear second and third storey balconies, and a rear yard parking pad. There will be a total of six residential dwelling units on this lot.

    10 m away · filed Feb 9, 2026 · Approved

  • 279 Cedarvale Ave · Minor variance

    To construct a new three-storey detached dwelling (houseplex) which will be cantilevered at the front second storey, with one front yard parking pad, front and rear basement walkouts, a front covered porch with stairs, a rear ground floor deck with stairs, and front and rear third storey balconies. There will be a total of six residential dwelling units on this lot.

    220 m away · filed Dec 4, 2025 · Approved

  • 215 King Edward Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition with a second storey balcony.

    160 m away · filed Oct 6, 2025 · Approved

  • 250 Lumsden Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a front second floor addition with a terrace, and a rear two-storey addition.

    120 m away · filed Aug 7, 2025 · Approved

  • 272 Gledhill Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a front ground floor deck, and a rear two-storey addition with deck. To construct a new one-storey ancillary building (detached garage in the rear yard) with driveway, abutting Barker Avenue.

    220 m away · filed Apr 3, 2025 · Approved

  • 169 Gledhill Ave · Minor variance

    To alter the existing two-storey detached dwelling by reconstructing the existing enclosed front enclosure that was constructed without an authorized building permit, and to construct a front second storey addition (above the enclosed porch), and a front porch with stairs and a canopy. Also, to permit the rear ground floor deck with stairs that was constructed without an authorized building permit (the rear deck is obstructing access to the parking space in the rear yard).

    150 m away · filed Jan 2, 2025 · Approved

  • 33 Wallington Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear one-storey addition with a rear second storey rooftop deck above, and a rear ground floor deck.

    240 m away · filed Jul 22, 2024 · Approved

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.