Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

215 Wellesley St E

The City of Toronto has 17 building permits since 2017 (10 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Fire and security upgrade · Electromagnetic locks

    Installation of fire alarm electromagnetic locking devices

    Applied Oct 22, 2025 · issued Nov 28, 2025 · Permit 25 243711 FSU

    Permit issued
  • Alternative solution

    Proposed to encapsulate the upper surface of the CLT floor assemblies with Fermacell floorboard, which consists of two layers of 1/2" Type X GWB and mineral wool insulation.

    Applied Oct 10, 2024 · completed Nov 1, 2024 · Permit 24 224831 ALT

    Approved
  • Alternative solution

    proposed to encapsulate the mass timber ceiling surfaces with a single layer of 15.9 mm Type X GWB following the 2024 British Columbia Building Code guidelines for an 8-storey residential building.

    Applied Oct 10, 2024 · completed Nov 1, 2024 · Permit 24 224832 ALT

    Approved
  • New building

    REV 01 - Revision to replacement of structural engineerProposal to construct new 8 Storey Transitional Housing Mass Timber building containing residential and office use.

    Applied Sep 18, 2024 · issued Oct 7, 2024 · Permit 23 170676 BLD (revision 01)

    Revision issued
  • Conditional permit · Inside and outside drains

    Conditional Permit - Drain - Proposal to construct new 8 Storey Transitional Housing Mass Timber building containing residential and office use.

    Applied Sep 28, 2023 · issued Oct 16, 2023 · completed Jul 4, 2024 · Permit 23 170676 STS

    Closed
  • Drains and site services

    Drain - Proposal to construct new Transitional Housing containing residential and office use.

    Applied Aug 25, 2023 · issued Sep 28, 2023 · Permit 23 170676 DRN

    Inspections under way
  • Plumbing

    Plumbing - Proposal to construct new Transitional Housing containing residential and office use.

    Applied Aug 25, 2023 · issued Aug 14, 2024 · Permit 23 170676 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to construct new 8 Storey Transitional Housing Mass Timber building containing residential and office use.

    Applied Aug 25, 2023 · issued Jul 8, 2024 · Permit 23 170676 HVA

    Inspections under way
  • Partial permit · Partial permit - structural framing

    Part Permit - Proposal to construct new 8 Storey Transitional Housing Mass Timber building containing residential and office use.

    Applied Aug 23, 2023 · completed Apr 19, 2024 · Permit 23 170676 STR

    Cancelled
  • Alternative solution

    Proposed Alternative SolutionThe proposed development at 215 Wellesley will be provided with a standpipe system. 65 mm fire hose valve connections will be located within the stairs at the main landing for levels above the entrance (30m long hose + m hose steam ). Details of the proposal can be found in the attached alternative solution report.

    Applied Aug 11, 2023 · completed Jul 11, 2024 · Permit 23 187371 ALT

    Approved
  • Alternative solution

    The proposed development at 215 Wellesley will be provided with a standpipe system. 65 mm fire hose valve connections will be located within the exit stairs at the main landings for levels above the entrance storey. Fire hose station will be provided within the floor area of the main storey to provide the required fire hose coverage (30 m long hose + 3 m hose stream). Details of the proposal can be found in the attached alternative solution report.

    Applied Aug 9, 2023 · completed Jul 4, 2024 · Permit 23 186281 ALT

    Cancelled
  • Heating and ventilation · Other

    Project work to include drilling of boreholes, lateral tie-ins, manifolds, and pumping for geo-exchangesystem at 215 Wellesley Street.

    Applied Jul 19, 2023 · issued Aug 17, 2023 · Permit 23 177048 MSA

    Inspections under way
Show 5 more permits
  • Addition or alteration · Other

    Proposal for the drilling of boreholes, lateral tie-ins, manifolds, and pumping for geo-exchange system on an existing vacant lot (23 115850 DEM).

    Applied Jul 10, 2023 · completed Aug 2, 2023 · Permit 23 172058 BLD

    Cancelled
  • Partial permit · Partial permit - foundation

    Part Permit - Proposal to construct new Transitional Housing containing residential and office use.

    Applied Jul 7, 2023 · completed Sep 22, 2023 · Permit 23 170676 FND

    Cancelled
  • New building

    Proposal to construct new 8 Storey Transitional Housing Mass Timber building containing residential and office use.

    Applied Jul 6, 2023 · issued Apr 19, 2024 · 48 homes added · Permit 23 170676 BLD

    Inspections under way
  • Demolition

    PROPOSED: Demolition of existing structure at the identified address.

    Applied Feb 21, 2023 · issued Mar 22, 2023 · completed Nov 1, 2023 · Permit 23 115850 DEM

    Closed
  • Fire and security upgrade · Fire alarm

    Proposal for the replacement of the fire alarm control panel.

    Applied Nov 6, 2020 · issued Dec 8, 2020 · completed Oct 10, 2023 · Permit 20 215788 FSU

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 41 Rose Ave · Consent

    To obtain consent for a technical severance to re-establish two residential lots which merged on title.

    210 m away · filed Dec 22, 2022 · Approved

  • 159 Wellesley St E · Consent

    To obtain consent for the creation of a new easement.

    160 m away · filed Dec 7, 2020 · Approved with conditions

  • 96 Bleecker St · Minor variance

    To alter the existing 2½-storey townhouse by constructing a rear third storey addition with a balcony.

    210 m away · filed Jan 4, 2019 · Approved

  • 159 Wellesley St E · Minor variance

    To alter the redevelopment plan for a 36-storey mixed-used building, approved under Site-Specific By-law 826-2013 with respect to development standards associated with: gross floor area, building height, dwelling unit breakdown, rate of indoor amenity space, off-site parking, bicycle parking spaces, and building envelope.

    160 m away · filed Feb 16, 2017 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.