Toronto address · Ward 21, Scarborough Centre
2155 Midland Ave
The City of Toronto has 3 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Designated structure · Sign building permit related
Application for a permit to replace one existing one-sided third party electronic ground sign to a double-sided third party electronic ground sign with a v-shaped configuration, each sign face measuring 2.30m vertically by 8.69m Horizontally at a height of 10m.Variance with 4 conditions granted by SVC in June 3rd, 2022.Existing third party application is 20-16429.***OUTDOOR ADVERTISING***
Applied Jul 4, 2022 · issued Jul 29, 2022 · completed Nov 18, 2022 · Permit 22 171998 DST
- Closed
Designated structure · Sign building permit related
The proposal contains one illuminated ground sign, displaying electronic static copy located along the west frontage. ****OUTFRONT MEDIA****
Applied Jul 7, 2020 · issued Jul 23, 2020 · completed Dec 7, 2021 · Permit 20 164291 DST
- Cancelled
Designated structure · Sign building permit related
2 non illuminated FIRST PARTY wall signs
Applied Jul 13, 2010 · completed Oct 2, 2019 · Permit 10 218715 DST
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
2199 Midland Ave · Minor variance
To permit the use of a educational tutoring center for children ages 3-14.
120 m away · filed Jun 5, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.