Toronto address · Ward 14, Toronto-Danforth
218 Fulton Ave
The City of Toronto has 6 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing
Plumbing - Proposed: Basement dig out, benching and 3' of underpinning
Applied Jun 26, 2018 · issued Jun 26, 2018 · completed Sep 5, 2025 · Permit 18 127819 PLB
- Closed
Drains and site services
Drain - Proposed: Basement dig out, benching and 3' of underpinning
Applied Jun 26, 2018 · issued Jun 26, 2018 · completed Sep 5, 2025 · Permit 18 127819 DRN
- Closed
Small residential project · Underpinning
Proposed: Basement dig out, benching and 3' of underpinning
Applied Mar 12, 2018 · issued Apr 4, 2018 · completed Sep 5, 2025 · Permit 18 127819 BLD
- Closed
Heating and ventilation
HVAC - Reconstruct front proch with partial roof, interior alterations to 1st and 2nd floors.
Applied Sep 14, 2012 · issued Oct 5, 2012 · completed Feb 6, 2018 · Permit 12 246772 HVA
- Closed
Plumbing
Plumbing - Reconstruct front proch with partial roof, interior alterations to 1st and 2nd floors.
Applied Sep 14, 2012 · issued Sep 17, 2012 · completed Feb 6, 2018 · Permit 12 246772 PLB
- Closed
Small residential project · Multiple projects
Reconstruct front proch with partial roof, interior alterations to 1st and 2nd floors.
Applied Sep 14, 2012 · issued Sep 17, 2012 · completed Feb 6, 2018 · Permit 12 246772 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
28 East York Ave · Minor variance
To alter the existing three-storey townhouse dwelling by constructing an extension to the rear first floor deck (cantilevered over the existing driveway and parking space, which will be maintained and unaltered).
160 m away · filed Sep 2, 2026 · Hearing scheduled
224 Fulton Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by enclosing a portion of the front porch (for habitable space), a front third floor dormer expansion, a rear basement window well, a rear cantilevered second floor addition, and a rear third floor dormer addition with a rooftop deck (above the existing rear addition). The existing rear one-storey addition will be demolished.
20 m away · filed Mar 12, 2026 · Approved
157 Browning Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a complete third storey addition, a front new canopy above the existing porch, and a rear three-storey addition with a deck and stairs.
220 m away · filed May 30, 2025 · Approved
234 Browning Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a partial front one-storey addition (solarium). Also, to construct a one-storey ancillary building (detached garage), in the front yard.
140 m away · filed Jul 24, 2024 · Approved
196 Fulton Ave · Minor variance
To construct a new one-storey ancillary building (detached garage with an undersized parking space) in the rear yard of the existing two-storey semi-detached dwelling. The existing detached garage, shed, and a portion of the rear ground floor deck will be demolished.
70 m away · filed May 30, 2024 · Approved
889 Carlaw Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a rear balcony.
230 m away · filed Dec 13, 2023 · Approved
860 Pape Ave · Minor variance
To permit a 'Kennel and Pet Services' use within the existing two-storey building.
130 m away · filed Apr 13, 2023 · Approved
202 Browning Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third-storey addition.
100 m away · filed Mar 24, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.