The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Other

    Admin partywall permit in conjunction with 15-157872, 2190 Queen St E.

    Applied Sep 14, 2015 · issued Nov 19, 2015 · completed Apr 14, 2025 · Permit 15 222299 BLD

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 26 Hazel Ave · Consent

    To obtain consent to create a new easement/right-of-way.

    220 m away · filed Feb 19, 2026 · Approved

  • 52 Balsam Ave · Minor variance

    To maintain the existing two-storey semi-detached dwelling (duplex). There is a total of two residential dwelling units on this lot.

    50 m away · filed Feb 3, 2026 · Postponed

  • 52 Balsam Ave · Minor variance

    To maintain the existing two-storey semi-detached dwelling (duplex). There is a total of two residential dwelling units on this lot.

    50 m away · filed Feb 3, 2026 · Postponed

  • 52 Balsam Ave · Consent

    To obtain consent to sever the property into two residential lots.

    50 m away · filed Feb 3, 2026 · Postponed

  • 34 Balsam Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear second storey addition (above a portion of the existing rear ground floor) with a new roof (for the remaining portion of the existing rear ground floor), and a new rear ground floor deck with stairs. The existing rear ground floor deck will be demolished.

    180 m away · filed Aug 25, 2025 · Approved

  • 34 Fernwood Park Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing an integral garage, a partial third storey addition, a rear basement walkout, and a rear first level deck. The front porch will be reconstructed with a canopy and stairs. There will be a total of two residential dwelling units (duplex) on this lot (one unit within the basement level, and one unit to occupy the first, second, and third levels).

    220 m away · filed Jul 28, 2025 · Approved

  • 32 Fernwood Park Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a partial third storey addition, a rear first level deck, and rear and side (south) basement walkouts. The front porch will be reconstructed with a canopy and stairs. One parking space will be located in the rear yard, which will be accessed from a shared mutual right-of-way between 30 and 32 Fernwood Park Avenue. There will be a total of two residential dwelling units (duplex) on this lot (one unit within the basement level, and one unit to occupy the first, second, and third levels).

    230 m away · filed Jul 28, 2025 · Approved

  • 34 Fernwood Park Ave · Minor variance

    To alter the existing three-storey semi-detached duplex dwelling (basement level is considered the first storey) by constructing an integral garage, a partial fourth storey addition, a rear second level deck, a raised front porch with stairs and canopy, and front and rear basement walkouts. There will be a total of two residential dwelling units on this lot (one unit within the basement level, and one unit occupying the second, third, and fourth levels).

    220 m away · filed Jun 2, 2025 · Refused

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.