Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 24, Scarborough-Guildwood

2190 Ellesmere Rd

The City of Toronto has 28 building permits since 2017 (14 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Interior alterations

    Revision 02 - new fire alarm riser relocated and relocation of existing maglockRevision 01. Fire alarm riser addedProposal for interior alterations to enhance accessibility and tenant communal space in the basement, ground floor, and 15 floors of the building.

    Applied Jun 10, 2024 · issued Jul 9, 2024 · Permit 22 132240 BLD (revision 02)

    Revision issued
  • Addition or alteration · Interior alterations

    Revision 01. Fire alarm riser addedProposal for interior alterations to enhance accessibility and tenant communal space in the basement, ground floor, and 15 floors of the building.

    Applied Sep 8, 2022 · issued Oct 21, 2022 · Permit 22 132240 BLD (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to enhance accessibility and tenant communal space in the basement, ground floor, and 15 floors of the building.

    Applied Apr 8, 2022 · issued May 27, 2022 · Permit 22 132240 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for interior alterations to enhance accessibility and tenant communal space.

    Applied Apr 8, 2022 · issued Jun 2, 2022 · Permit 22 132240 HVA

    Permit issued
  • Plumbing

    Plumbing - Proposal for interior alterations to enhance accessibility and tenant communal space.

    Applied Apr 8, 2022 · issued Jun 2, 2022 · Permit 22 132240 PLB

    Inspections under way
  • Addition or alteration · Other

    Rev 02- Corridors for 5 floors will be expanded to accommodate installation of thefire rated access panels inside the corridors.Expansion of fire rated enclosure and adding fire rated cavity shaft walls (bulkhead) inside staircases to cover new electrical conduitsrelocate communication cables inside the building

    Applied Dec 8, 2021 · issued Dec 21, 2021 · completed Aug 11, 2023 · Permit 19 158876 BLD (revision 02)

    Closed
  • Alternative solution

    Proposed Alternative Solutions a fire separation that separates an exit from the remainder of the building shall have no openings except for eletrical wires and cables, totally enclosed noncombustible raceways and noncombustible piping that serve only the exit.

    Applied Jul 9, 2021 · Permit 21 182021 ALT

    Under review
  • Heating and ventilation

    Hvac - proposal for interior alterations to enhance accessibility and tenant communal space for existing apartment building

    Applied Jun 21, 2021 · issued Aug 9, 2021 · Permit 21 173706 HVA

    Permit issued
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to enhance accessibility and tenant communal space for existing apartment building

    Applied Jun 21, 2021 · issued Aug 9, 2021 · Permit 21 173706 BLD

    Permit issued
  • Fire and security upgrade · Other

    Replacement of fire Pump

    Applied Mar 24, 2021 · issued Apr 21, 2021 · completed Mar 5, 2022 · Permit 21 131332 FSU

    Closed
  • Addition or alteration · Re-Roofing/Re-Cladding

    REV #2-REPLACE CLADDING WITH ELASTOMERIC COATING SYSTEM FOR PENTHOUSE AT ROOFProposed recladding, roof and window replacement

    Applied Dec 21, 2020 · issued Jan 22, 2021 · completed Jan 10, 2023 · Permit 17 267869 BLD (revision 02)

    Closed
  • Addition or alteration · Other

    Rev 01- Expansion of fire rated enclosure and adding fire rated cavity shaft walls (bulkhead) inside staircases to cover new electrical conduitsrelocate communication cables inside the building

    Applied Dec 18, 2020 · issued Feb 12, 2021 · completed Aug 11, 2023 · Permit 19 158876 BLD (revision 01)

    Closed
Show 16 more permits
  • Heating and ventilation · Other

    Replacement of a existing diesel emergency generator for a natural gas emergency generator for existing apartment building

    Applied Jul 20, 2020 · issued Sep 17, 2020 · completed Jul 27, 2021 · Permit 20 169770 MSA

    Closed
  • Heating and ventilation

    HVAC - Proposal for the installation of one combined heat and power unit in the parking garage and modifications to the existing heating and domestic hot water networks to reject its heat in the building. A new room to be built for the CHP unit and a new parking space will be added to replace the one removed. The total number of parking spaces will not change.

    Applied Apr 17, 2020 · issued May 12, 2020 · completed Aug 4, 2021 · Permit 20 134652 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for the installation of one combined heat and power unit in the parking garage and modifications to the existing heating and domestic hot water networks to reject its heat in the building. A new room to be built for the CHP unit and a new parking space will be added to replace the one removed. The total number of parking spaces will not change.

    Applied Apr 17, 2020 · issued May 12, 2020 · completed Oct 6, 2021 · Permit 20 134652 BLD

    Closed
  • Heating and ventilation

    REV 01 - Proposed HVAC revision (as-built drawings).HVAC - interior alterations to common areas, interior ramp, exterior ramp

    Applied Oct 10, 2019 · issued Nov 18, 2019 · Permit 18 159196 HVA (revision 02)

    Revision issued
  • Heating and ventilation

    REV 01 - Proposed HVAC revision (as-built drawings).HVAC - interior alterations to common areas, interior ramp, exterior ramp

    Applied Aug 22, 2019 · issued Sep 20, 2019 · Permit 18 159196 HVA (revision 01)

    Revision issued
  • Heating and ventilation

    HVAC - Proposed: Replacement of existing boilers with new condensing boilers with all associated equipment and piping. Replacement of Domestic hot water storage tanks, hot water secondary pumps with associated equipment and piping. Replacing Thermostatic valves for in-suite baseboard heaters. Demolish and replace two existing MAUs with two new ERVs. Replacement of all light fixtures with new LED fixtures. Installation of new feeder to the penthouse mechanical room and ATS and switchboard.

    Applied Jun 25, 2019 · issued Jul 25, 2019 · completed Oct 18, 2021 · Permit 19 177763 HVA

    Closed
  • Addition or alteration · Other

    Proposed: Replacement of existing boilers with new condensing boilers with all associated equipment and piping. Replacement of Domestic hot water storage tanks, hot water secondary pumps with associated equipment and piping. Replacing Thermostatic valves for in-suite baseboard heaters. Demolish and replace two existing MAUs with two new ERVs. Replacement of all light fixtures with new LED fixtures. Installation of new feeder to the penthouse mechanical room and ATS and switchboard.

    Applied Jun 25, 2019 · issued Jul 25, 2019 · completed Jul 30, 2021 · Permit 19 177763 BLD

    Closed
  • Addition or alteration · Other

    relocate communication cables inside the building

    Applied May 24, 2019 · issued Jun 7, 2019 · completed Aug 11, 2023 · Permit 19 158876 BLD

    Closed
  • Addition or alteration · Multiple projects

    Revision 01: Deleted items from the scope of work, refer to highlighted drawingsinterior alterations to common areas, interior ramp, exterior ramp

    Applied May 18, 2019 · issued Jun 19, 2019 · Permit 18 159196 BLD (revision 01)

    Revision issued
  • Addition or alteration · Re-Roofing/Re-Cladding

    REVISION - to change the building insulation from mineral wool (rockboard 80) to expanded polystyrene (EPS) insulation board for EIFS part of the new cladding.Proposed recladding, roof and window replacement.

    Applied Oct 15, 2018 · issued Dec 6, 2018 · completed Jan 10, 2023 · Permit 17 267869 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - interior alterations to common areas, interior ramp, exterior ramp

    Applied May 16, 2018 · issued Jun 25, 2018 · Permit 18 159196 HVA

    Inspections under way
  • Plumbing

    Plumbing - interior alterations to common areas, interior ramp, exterior ramp

    Applied May 16, 2018 · issued Jun 25, 2018 · Permit 18 159196 PLB

    Inspections under way
  • Addition or alteration · Multiple projects

    interior alterations to common areas, interior ramp, exterior ramp

    Applied May 15, 2018 · issued Jun 25, 2018 · Permit 18 159196 BLD

    Inspections under way
  • Fire and security upgrade · Electromagnetic locks

    Proposed maglock installation at the front door of the building.

    Applied Dec 14, 2017 · issued Jan 9, 2018 · completed Mar 7, 2018 · Permit 17 275717 FSU

    Closed
  • Addition or alteration · Re-Roofing/Re-Cladding

    Proposed recladding, roof and window replacement.

    Applied Nov 27, 2017 · issued Jun 28, 2018 · completed Jan 10, 2023 · Permit 17 267869 BLD

    Closed
  • Fire and security upgrade · Fire alarm

    Fire alarm control panel replacement.

    Applied Oct 2, 2017 · issued Oct 27, 2017 · completed Jul 26, 2018 · Permit 17 241743 FSU

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 1151 Markham Road

    Not stated in the file

    220 m away · Rezoning · Under review · filed Apr 27, 2026

    Under review
  • 1151 Markham Road

    44 storeys · 455 homes · Residential

    220 m away · Site plan · Under review · filed Apr 4, 2022

    Under review
  • 2141 Ellesmere Road and 1125 Markham Road

    36 storeys · Mixed use

    280 m away · Site plan · Under review · filed Aug 17, 2022

    Under review
  • 40-42 Tuxedo Court

    29 storeys · 644 homes · Residential

    390 m away · Condominium · Under review · filed Oct 5, 2021

    Under review
  • 1050 Markham Road

    37 storeys · 438 homes · Residential

    410 m away · Rezoning · Under review · filed Jul 3, 2024

    Under review
  • 1250-1260 Markham Road

    Not stated in the file

    430 m away · Site plan · Under review · filed Nov 17, 2023

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 2201 Ellesmere Rd · Consent

    To obtain consent to sever a portion of the land for the purpose of a lot addition in favor of 1125-1145 Markham Road and 2141 Ellesmere Road for the pruposes of a road. Cross Reference Zoning By-law Amendment (File No. 21 120678 ESC 24 OZ), Plan of Subdivision (File No. 21 120673 ESC 24 SB), and Site Plan Control (File No. 22 191957 ESC 24 SA) applications which are currently under review.

    160 m away · filed Sep 14, 2023 · Approved

  • 1221 Markham Rd · Minor variance

    To construct a mixed-use development consisting of three residential towers having heights of 21, 27 and 30 storeys, containing 879 dwelling units in total.

    180 m away · filed Oct 21, 2021 · Refused

Everything planned in Scarborough-Guildwood

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.