Toronto address · Ward 12, Toronto-St. Paul's
2191 Yonge St
The City of Toronto has 11 building permits since 2017 (8 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Plumbing
Plumbing - Proposal for interior alterations to first floor and third floor amenities area
Applied Apr 10, 2026 · issued Jun 2, 2026 · Permit 26 141459 PLB
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations to first floor and third floor amenities area
Applied Apr 10, 2026 · issued May 1, 2026 · Permit 26 141459 BLD
- Permit issued
Heating and ventilation
HVAC - Proposal for interior alterations to first floor and third floor amenities area
Applied Apr 10, 2026 · issued Jun 2, 2026 · Permit 26 141459 HVA
- Permit issued
Addition or alteration · Fire damage
Fire damage repairs to te balcony of unit 4002.
Applied Jun 19, 2025 · issued Jul 14, 2025 · Permit 25 180004 BLD
- Permit issued
Addition or alteration · Garage Repair/Reconstruction
Proposed repairs for underground parking garage of existing residential condominium.
Applied Oct 11, 2023 · issued Nov 16, 2023 · Permit 23 213242 BLD
- Closed
Addition or alteration · Garage Repair/Reconstruction
Proposal for ramp repairs and locker room waterproofing for existing residential condo
Applied Dec 6, 2019 · issued Dec 24, 2019 · completed Apr 14, 2020 · Permit 19 258250 BLD
- Inspections under way
Addition or alteration · Multiple projects
Shoring design to support floor and new openings. HVAC - Install CHP system - 2 x 170 kW generators. Installed in second mechanical penthosue connected to boiler loop and DHW heating circuit. Run one set of conductors to first mechanical penhouse and another to P1 to provide power to building.
Applied Nov 5, 2019 · issued Nov 14, 2019 · Permit 19 245487 BLD
- Refusal notice
Heating and ventilation
HVAC - Shoring design to support floor and new openings. HVAC - Install CHP system - 2 x 170 kW generators. Installed in second mechanical penthosue connected to boiler loop and DHW heating circuit. Run one set of conductors to first mechanical penhouse and another to P1 to provide power to building.
Applied Nov 5, 2019 · Permit 19 245487 HVA
- Closed
Plumbing · Backflow prevention devices (Water only)
To install a back flow prevention device
Applied Jul 15, 2015 · issued Aug 14, 2015 · completed Jun 8, 2026 · Permit 15 191519 PSA
- Permit issued
Heating and ventilation
HVAC - Proposal to install a rooftop communications tower and interior alterations of mechanical penthouse to house communications equipment.
Applied Nov 20, 2013 · issued Dec 16, 2013 · Permit 13 256586 HVA
- Inspections under way
Addition or alteration · Other
Proposal to install a rooftop communications tower and interior alterations of mechanical penthouse to house communications equipment.
Applied Oct 25, 2013 · issued Oct 29, 2013 · Permit 13 256586 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
2180-2210 Yonge Street and 20-46 Berwick Avenue
65 storeys · 2,892 homes · Mixed use
100 m away · Rezoning · Under review · filed Dec 23, 2022
- Under review
65 storeys · 600 homes · Mixed use
100 m away · Condominium · Under review · filed Oct 15, 2021
- Approved
- Under review
59 storeys · 613 homes · Mixed use
230 m away · Site plan · Under review · filed Apr 29, 2022
- Under review
65 storeys · 663 homes · Mixed use
230 m away · Condominium · Under review · filed Nov 4, 2021
- Approved
58 storeys · 1,035 homes · Mixed use
230 m away · Rezoning · Approved · filed Aug 15, 2022
Neighbours’ Committee of Adjustment files within 250 m
2161 Yonge St · Minor variance
To alter the development standards for the 38-storey mixed-use building (approved under Site Specific Zoning By-Law 153-2022(OLT)), to permit six obstructed parking spaces with a reduced width (located on parking levels P1 to P5).
110 m away · filed Jun 15, 2026 · Approved
78 Hillsdale Ave E · Minor variance
To construct a new three-storey detached dwelling (basement level is considered the first storey) with an integral garage, a front porch, a rear basement walkout, and a rear second level deck.
240 m away · filed Apr 16, 2025 · Approved
57 Soudan Ave · Minor variance
To permit the continued use on the site as a dental office, as well as to permit the conversion of the second floor of the building into additional dentist office space.
160 m away · filed Jan 27, 2025 · Approved
2161 Yonge St · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 153-2022(OLT)) for a 38-storey mixed-use building by increasing the residential gross floor area (for a total of 380 residential dwelling units), reducing the commercial (office) gross floor area, and reducing the number of required parking spaces. Also, to permit a home occupation use (personal service shop) within the building, and to reduce the required width of 4 obstructed parking spaces.
110 m away · filed Jun 17, 2024 · Approved
2161 Yonge St · Minor variance
To alter Site Specific Zoning By-law 153-2022 (Ontario Land Tribunal (OLT)) to increase the mixed-use building height, increase the total maximum gross floor area, increase the total residential gross floor area, and reduce the minimum length of 26 parking spaces.
110 m away · filed Feb 21, 2023 · Approved
51 Eglinton Ave E · Consent
To obtain consent to create an easement/right-of-way over a portion of the 51 Eglinton Avenue East in favour of 55 Eglinton Avenue East.
170 m away · filed Jan 18, 2022 · Approved
2131 Yonge St · Minor variance
To alter the existing mixed-use building by constructing a new mezzanine level in the existing ground floor restaurant space.
220 m away · filed Feb 5, 2021 · Approved
2295 Yonge St · Minor variance
To alter the existing two-storey commercial building by converting the second-floor into recreational space.
230 m away · filed Sep 1, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.