Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

2191 Yonge St

The City of Toronto has 11 building permits since 2017 (8 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal for interior alterations to first floor and third floor amenities area

    Applied Apr 10, 2026 · issued Jun 2, 2026 · Permit 26 141459 PLB

    Permit issued
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to first floor and third floor amenities area

    Applied Apr 10, 2026 · issued May 1, 2026 · Permit 26 141459 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for interior alterations to first floor and third floor amenities area

    Applied Apr 10, 2026 · issued Jun 2, 2026 · Permit 26 141459 HVA

    Permit issued
  • Addition or alteration · Fire damage

    Fire damage repairs to te balcony of unit 4002.

    Applied Jun 19, 2025 · issued Jul 14, 2025 · Permit 25 180004 BLD

    Permit issued
  • Addition or alteration · Garage Repair/Reconstruction

    Proposed repairs for underground parking garage of existing residential condominium.

    Applied Oct 11, 2023 · issued Nov 16, 2023 · Permit 23 213242 BLD

    Permit issued
  • Addition or alteration · Garage Repair/Reconstruction

    Proposal for ramp repairs and locker room waterproofing for existing residential condo

    Applied Dec 6, 2019 · issued Dec 24, 2019 · completed Apr 14, 2020 · Permit 19 258250 BLD

    Closed
  • Addition or alteration · Multiple projects

    Shoring design to support floor and new openings. HVAC - Install CHP system - 2 x 170 kW generators. Installed in second mechanical penthosue connected to boiler loop and DHW heating circuit. Run one set of conductors to first mechanical penhouse and another to P1 to provide power to building.

    Applied Nov 5, 2019 · issued Nov 14, 2019 · Permit 19 245487 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Shoring design to support floor and new openings. HVAC - Install CHP system - 2 x 170 kW generators. Installed in second mechanical penthosue connected to boiler loop and DHW heating circuit. Run one set of conductors to first mechanical penhouse and another to P1 to provide power to building.

    Applied Nov 5, 2019 · Permit 19 245487 HVA

    Refusal notice
  • Plumbing · Backflow prevention devices (Water only)

    To install a back flow prevention device

    Applied Jul 15, 2015 · issued Aug 14, 2015 · completed Jun 8, 2026 · Permit 15 191519 PSA

    Closed
  • Heating and ventilation

    HVAC - Proposal to install a rooftop communications tower and interior alterations of mechanical penthouse to house communications equipment.

    Applied Nov 20, 2013 · issued Dec 16, 2013 · Permit 13 256586 HVA

    Permit issued
  • Addition or alteration · Other

    Proposal to install a rooftop communications tower and interior alterations of mechanical penthouse to house communications equipment.

    Applied Oct 25, 2013 · issued Oct 29, 2013 · Permit 13 256586 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 2161 Yonge St · Minor variance

    To alter the development standards for the 38-storey mixed-use building (approved under Site Specific Zoning By-Law 153-2022(OLT)), to permit six obstructed parking spaces with a reduced width (located on parking levels P1 to P5).

    110 m away · filed Jun 15, 2026 · Approved

  • 78 Hillsdale Ave E · Minor variance

    To construct a new three-storey detached dwelling (basement level is considered the first storey) with an integral garage, a front porch, a rear basement walkout, and a rear second level deck.

    240 m away · filed Apr 16, 2025 · Approved

  • 57 Soudan Ave · Minor variance

    To permit the continued use on the site as a dental office, as well as to permit the conversion of the second floor of the building into additional dentist office space.

    160 m away · filed Jan 27, 2025 · Approved

  • 2161 Yonge St · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 153-2022(OLT)) for a 38-storey mixed-use building by increasing the residential gross floor area (for a total of 380 residential dwelling units), reducing the commercial (office) gross floor area, and reducing the number of required parking spaces. Also, to permit a home occupation use (personal service shop) within the building, and to reduce the required width of 4 obstructed parking spaces.

    110 m away · filed Jun 17, 2024 · Approved

  • 2161 Yonge St · Minor variance

    To alter Site Specific Zoning By-law 153-2022 (Ontario Land Tribunal (OLT)) to increase the mixed-use building height, increase the total maximum gross floor area, increase the total residential gross floor area, and reduce the minimum length of 26 parking spaces.

    110 m away · filed Feb 21, 2023 · Approved

  • 51 Eglinton Ave E · Consent

    To obtain consent to create an easement/right-of-way over a portion of the 51 Eglinton Avenue East in favour of 55 Eglinton Avenue East.

    170 m away · filed Jan 18, 2022 · Approved

  • 2131 Yonge St · Minor variance

    To alter the existing mixed-use building by constructing a new mezzanine level in the existing ground floor restaurant space.

    220 m away · filed Feb 5, 2021 · Approved

  • 2295 Yonge St · Minor variance

    To alter the existing two-storey commercial building by converting the second-floor into recreational space.

    230 m away · filed Sep 1, 2020 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.