Toronto address · Ward 4, Parkdale-High Park
22 Glenwood Ave
The City of Toronto has 4 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Cancelled
Small residential project · Accessory Building(s)
Construct a rear yard shed and cabana.
Applied May 29, 2024 · completed May 31, 2024 · Permit 24 156026 BLD
- Inspections under way
Heating and ventilation
HVAC - Proposal for addition (61.4m2) and interior alterations (6.5m2) to existing single family detached dwelling. See related ZC file 14-229855 and C of A file A49/15EYK.
Applied Mar 27, 2019 · issued Apr 23, 2019 · Permit 19 131634 HVA
- Inspections under way
Plumbing
Plumbing - Proposal for addition (61.4m2) and interior alterations (6.5m2) to existing single family detached dwelling. See related ZC file 14-229855 and C of A file A49/15EYK.
Applied Mar 27, 2019 · issued Apr 23, 2019 · Permit 19 131634 PLB
- Inspections under way
Small residential project · Multiple projects
Proposal for addition (61.4m2) and interior alterations (6.5m2) to existing single family detached dwelling. See related ZC file 14-229855 and C of A file A49/15EYK.
Applied Mar 27, 2019 · issued Apr 23, 2019 · Permit 19 131634 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
50 Glenwood Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear one-storey addition with a ground floor deck. Also, to construct a new one-storey detached ancillary structure (storage shed) in the rear yard. The lawfully existing parking space in the rear yard will be removed. There will be no parking space(s) on this lot.
80 m away · filed Feb 2, 2026 · Approved
59 Fairview Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a new rear two-storey addition with a ground floor deck. The existing rear one-storey addition will be demolished.
180 m away · filed Mar 14, 2025 · Approved
11 Fairview Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition, a rear basement addition, a complete third floor addition, a rear ground floor deck, and a third floor balcony.
110 m away · filed Jan 17, 2023 · Approved
59 Gilmour Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition with a rooftop deck (above the second storey portion of the dwelling).
200 m away · filed Oct 7, 2022 · Approved
68 Gilmour Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by enclosing half of the front porch to create a mudroom.
230 m away · filed Aug 2, 2022 · Approved
98 Evelyn Cres · Minor variance
To alter the existing two-storey detached dwelling by constructing a front one-storey addition with a new front porch and stairs, a new front canopy and a new second storey front balcony. Also, to alter the existing ancillary building (rear one-storey detached garage) by constructing a new roof and new dormers.
150 m away · filed Jan 26, 2022 · Approved
41 Gilmour Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a two-storey rear addition with a ground floor deck and a second floor deck.
130 m away · filed May 6, 2021 · Approved
17 Webb Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a two-storey rear addition.
180 m away · filed Feb 12, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.