Toronto address · Ward 11, University-Rosedale
22 St Thomas St
The City of Toronto has 10 building permits since 2017 (10 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Not started
Heating and ventilation
Hvac - renovation of existing condominium suite internal renovation 325 sm see proposd plans building, plumbing and hvac
Applied Sep 21, 2026 · Permit 26 240998 HVA
- Not started
Addition or alteration · Interior alterations
Renovation of existing condominium suite internal renovation 325 sm see proposd plans building, plumbing and hvac
Applied Sep 21, 2026 · Permit 26 240998 BLD
- Not started
Plumbing
Plumbing - RENOVATION OF EXISTING CONDOMINIUM SUITE INTERNAL RENOVATION 325 SM SEE PROPOSD PLANS BUILDING, PLUMBING AND HVAC
Applied Sep 21, 2026 · Permit 26 240998 PLB
- Permit issued
Heating and ventilation · Other
Make-up air unit replacement in the mechanical/boiler room at lower penthouse level.
Applied Aug 27, 2025 · issued Oct 27, 2025 · Permit 25 216935 MSA
- Permit issued
Addition or alteration · Garage Repair/Reconstruction
Proposal for replacement of parking garage membrane and localized concrete repairs to existing condo building.
Applied Dec 6, 2017 · issued Dec 11, 2017 · Permit 17 272384 BLD
- Inspections under way
Plumbing
Plumbing - To complete interior alterations to Unit 2001 of the existing condo building.
Applied May 7, 2014 · issued May 15, 2014 · Permit 14 152798 PLB
- Permit issued
Addition or alteration · Interior alterations
To complete interior alterations to Unit 2001 of the existing condo building.
Applied May 7, 2014 · issued May 15, 2014 · Permit 14 152798 BLD
- Inspections under way
Plumbing
Plumbing - Proposal for interior alterations to the 18th floor, unit 18B, of existing residential condo building (224.0m2).
Applied Feb 11, 2013 · issued Feb 15, 2013 · Permit 12 296192 PLB
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations to the 18th floor, unit 18B, of existing residential condo building (224.0m2).
Applied Dec 19, 2012 · issued Jan 30, 2013 · Permit 12 296192 BLD
- Permit issued
Plumbing · Other
This is for the re-location of a cold and hot water line on the 8th floor.
Applied Jun 11, 2012 · issued Jun 13, 2012 · Permit 12 190203 PSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under appeal
80 storeys · 1,144 homes · Mixed use
50 m away · Site plan · Under appeal · filed Dec 17, 2021
- Under review
78 storeys · 1,716 homes · Mixed use
120 m away · Site plan · Under review · filed Aug 11, 2023
- Under review
Not stated in the file
120 m away · Subdivision · Under review · filed Sep 24, 2021
- Under appeal
29 storeys · 143 homes · Mixed use
220 m away · Site plan · Under appeal · filed Dec 29, 2021
- Under review
35 storeys · 357 homes · Mixed use
240 m away · Site plan · Under review · filed Sep 17, 2021
- Under review
188-200 Cumberland Street, 135-155 Yorkville Avenue and 21 Avenue Road
Not stated in the file
270 m away · Condominium · Under review · filed Jul 2, 2024
Neighbours’ Committee of Adjustment files within 250 m
6 St Thomas St · Consent
To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.
70 m away · filed May 26, 2026 · Hearing scheduled
2 St Thomas St · Consent
To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.
100 m away · filed Dec 31, 2025 · Hearing scheduled
70 St Mary St · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-Law 1422-2017), for the 40-storey mixed-use building by: increasing the podium height (from 3-storeys to 6-storeys); and altering building setbacks (in order to consolidate the non-residential institutional uses within the podium). No changes to the tower or residential uses are proposed. Also, to reduce the minimum required number of parking spaces for institutional uses (from 11 parking spaces to 5 parking spaces), which will be located within underground parking level P1.
190 m away · filed Dec 9, 2024 · Approved
128 Cumberland St · Minor variance
To alter the existing three storey commercial building by constructing a new exit stair on the roof.
180 m away · filed Oct 30, 2024 · Application withdrawn
80 Bloor St W · Minor variance
To alter the development standards for the 78-storey mixed-use building (as approved under Site Specific Zoning By-law XXX-XXXX(OLT)) by increasing the total residential gross floor area, removing the minimum gross floor area for office uses, altering the building envelope (as shown in Revised Diagram 3 and Revised Diagram 4), and removing the minimum required residential parking spaces.
140 m away · filed Jul 11, 2024 · Postponed
7 Sultan St · Minor variance
To alter the existing 9-storey commercial building by constructing a front ground floor one-storey addition (vestibule with an integrated rain water management system) fronting Sultan Street between two office condominium units (5 and 7 Sultan Street).
90 m away · filed May 14, 2024 · Approved
130 Bloor St W · Minor variance
To alter the existing 22-storey mixed-use building by reducing the amount of parking spaces provided in the underground parking garage.
130 m away · filed Apr 29, 2024 · Approved
130 Bloor St W · Minor variance
To alter the existing ramps for pedestrian access for two existing retail units (114 and 115) by increasing the slopes.
130 m away · filed Apr 12, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.