Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

22 Strader Ave

The City of Toronto has 7 building permits since 2017 (7 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Revision 02: west elevation cladding change to combustible EPS / EIFS cladding meeting CAN/ULC-S134.Rev 01: Changes to basement rear addition area, exterior finish spec, building dimensions and setbacks,Proposal for a new 2nd floor addition, interior alterations, front walkout, front porch, rear deck and new 2nd suite in the basement.See also 25 172836 ZAP and 25 175582 MV.existing first floor reno: 80 m2, existing basement reno: 80 m2, new floor area: 108 m2, new basement unit, front walkout, front porch, rear deck

    Applied Mar 27, 2026 · issued Apr 23, 2026 · Permit 25 224205 BLD (revision 02)

    Revision issued
  • Heating and ventilation

    REVISION 2 - revised drawingsHVAC - Proposal for a new 2nd floor addition, interior alterations, front walkout, front porch, rear deck and new 2nd suite in the basement.See also 25 172836 ZAP and 25 175582 MV.existing first floor reno: 80 m2, existing basement reno: 80 m2, new floor area: 108 m2, new basement unit, front walkout, front porch, rear deck

    Applied Feb 19, 2026 · issued Mar 12, 2026 · Permit 25 224205 HVA (revision 02)

    Revision issued
  • Heating and ventilation

    HVAC - Proposal for a new 2nd floor addition, interior alterations, front walkout, front porch, rear deck and new 2nd suite in the basement.See also 25 172836 ZAP and 25 175582 MV.existing first floor reno: 80 m2, existing basement reno: 80 m2, new floor area: 108 m2, new basement unit, front walkout, front porch, rear deck

    Applied Jan 16, 2026 · issued Feb 2, 2026 · Permit 25 224205 HVA (revision 01)

    Revision issued
  • Small residential project · Multiple projects

    Rev 01: Changes to basement rear addition area, exterior finish spec, building dimensions and setbacks,Proposal for a new 2nd floor addition, interior alterations, front walkout, front porch, rear deck and new 2nd suite in the basement.See also 25 172836 ZAP and 25 175582 MV.existing first floor reno: 80 m2, existing basement reno: 80 m2, new floor area: 108 m2, new basement unit, front walkout, front porch, rear deck

    Applied Oct 30, 2025 · issued Nov 17, 2025 · Permit 25 224205 BLD (revision 01)

    Revision issued
  • Small residential project · Multiple projects

    Proposal for a new 2nd floor addition, interior alterations, front walkout, front porch, rear deck and new 2nd suite in the basement.See also 25 172836 ZAP and 25 175582 MV.existing first floor reno: 80 m2, existing basement reno: 80 m2, new floor area: 108 m2, new basement unit, front walkout, front porch, rear deck

    Applied Sep 11, 2025 · issued Oct 17, 2025 · 1 home added · Permit 25 224205 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for a new 2nd floor addition, interior alterations, front walkout, front porch, rear deck and new 2nd suite in the basement.See also 25 172836 ZAP and 25 175582 MV.existing first floor reno: 80 m2, existing basement reno: 80 m2, new floor area: 108 m2, new basement unit, front walkout, front porch, rear deck

    Applied Sep 11, 2025 · issued Oct 17, 2025 · Permit 25 224205 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal for a new 2nd floor addition, interior alterations, front walkout, front porch, rear deck and new 2nd suite in the basement.See also 25 172836 ZAP and 25 175582 MV.existing first floor reno: 80 m2, existing basement reno: 80 m2, new floor area: 108 m2, new basement unit, front walkout, front porch, rear deck

    Applied Sep 11, 2025 · issued Oct 17, 2025 · Permit 25 224205 PLB

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing one-storey detached dwelling by constructing a front one-storey addition (including a walkout basement), and a complete second floor addition with a front balcony. Also, to reconstruct the covered front porch with stairs. There will be a total of two residential dwelling units on this lot.

    Decision: Approved (hearing Jul 30, 2025)

    Filed Jun 11, 2025 · File A0438/25TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 52 Bude St · Minor variance

    To construct a new three-storey detached dwelling with a front integral garage, a front porch with stairs and a canopy, a rear basement walkout, and a rear first level deck.

    180 m away · filed Aug 4, 2026 · Hearing scheduled

  • 88 Bude St · Minor variance

    80 m away · filed May 14, 2026 · Postponed

  • 636 Vaughan Rd · Minor variance

    To construct a new patio (for the existing eating establishment) in the rear yard of the existing two-storey mixed-use building. Also, to construct a canopy for the new patio in the rear yard.

    160 m away · filed Oct 21, 2025 · Postponed

  • 571 Oakwood Ave · Minor variance

    To construct a new three-storey apartment building containing 10 residential dwelling units, with a covered front entrance at the northwest portion of the building, 6 rooftop terraces (located at the northwest, northeast, southeast, southwest, and side (south) portions of the building above the third floor) with one rooftop staircase access enclosure. Also, to construct a one-storey detached ancillary building (bicycle storage shed) in the rear yard. The existing rear shed will be demolished.

    210 m away · filed Sep 30, 2025 · Approved

  • 47 Clovelly Ave · Minor variance

    To legalize and to maintain the conversion of the below-grade integral garage into habitable space, as well as the conversion of the existing two-storey detached dwelling into a triplex, without an authorized building permit. There are three residential dwelling units on this site.

    120 m away · filed Aug 22, 2025 · Refused

  • 113 Alameda Ave · Minor variance

    To construct a new three-storey detached dwelling (fourplex) with a front porch with stairs, front ground and third floor balconies, a rear basement walkout, rear stairs (providing access to the ground floor integrated storage), rear second and third floor balconies, and a rear exterior staircase (leading to all three levels). Also, to extend the existing driveway for two parking spaces, abutting the side (north) lot line. There will be four residential dwelling units on this lot.

    190 m away · filed Jun 12, 2025 · Approved

  • 118 Bude St · Minor variance

    To construct a two-storey ancillary building (containing one garden suite) in the rear yard of the property. There will be a total of three residential dwelling units on this lot (two units occupying the main dwelling and one unit occupying the ancillary building). The existing sheds will be demolished.

    210 m away · filed May 30, 2025 · Approved

  • 61 Clovelly Ave · Minor variance

    To construct a new three-storey semi-detached dwelling with front and rear basement patios, front and rear ground floor porch with stairs, a rear second floor balcony, and a rear third storey platform.

    130 m away · filed Nov 7, 2024 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.