Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

223 Wallace Ave

The City of Toronto has 2 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal for interior alterations to create a 2nd unit in basement to existing sfd-semi.

    Applied Nov 13, 2017 · issued Nov 15, 2017 · completed Mar 1, 2022 · Permit 17 261246 PLB

    Cancelled
  • Small residential project · Interior alterations

    Proposal for interior alterations to create a 2nd unit in basement to existing sfd-semi.

    Applied Nov 13, 2017 · issued Nov 15, 2017 · completed Mar 1, 2022 · 1 home added · Permit 17 261246 BLD

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 763 Lansdowne Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a third storey addition with a rear deck, a rear one-storey addition, and a front second storey deck. Also, to construct a new two-storey ancillary building (detached garage with a workshop and storage space above) in the rear yard, abutting the laneway.

    200 m away · filed Aug 26, 2025 · Approved

  • 193 Rankin Cres · Minor variance

    To alter the existing three-storey semi-detached dwelling by enclosing the rear third storey rooftop deck.

    150 m away · filed May 6, 2025 · Approved

  • 710 Lansdowne Ave · Minor variance

    To construct a new four-storey semi-detached multiplex (containing five residential dwelling units) with front and rear balconies on the second, third, and fourth storeys, a front porch, a rear ground floor deck, and a rear basement walkout.

    200 m away · filed Aug 1, 2024 · Approved

  • 710 Lansdowne Ave · Consent

    To obtain consent to sever the property into two undersized residential lots.

    200 m away · filed Aug 1, 2024 · Approved

  • 710 Lansdowne Ave · Minor variance

    To construct a new four-storey semi-detached multiplex (containing five residential dwelling units) with front and rear balconies on the second, third, and fourth storeys, a front porch, a rear ground floor deck, and a rear basement walkout.

    200 m away · filed Aug 1, 2024 · Approved

  • 568 St Clarens Ave · Minor variance

    To construct a two-storey ancillary building (detached garage with storage space above) in the rear yard, abutting the laneway.

    190 m away · filed May 3, 2024 · Approved

  • 105 Campbell Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear ground floor addition, rear and south side second storey additions, a complete third storey addition, a new rear basement walkout, and rear external stairs on all levels. There will be a total of three residential units in this dwelling.

    250 m away · filed Jan 17, 2024 · Refused

  • 105 Campbell Ave · Minor variance

    To convert the existing two-storey semi-detached dwelling from two dwelling units into three dwelling units by constructing a third storey addition and a rear three-storey addition. Also, to construct a new rear basement walkout, as well as a rear exterior three-storey staircase.

    250 m away · filed Jun 1, 2023 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.