Toronto address · Ward 8, Eglinton-Lawrence
224 Briar Hill Ave
The City of Toronto has 6 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
REV01: Proposal for revision of HVAC as per drawingsHVAC - Proposal for an addition, new wood deck, 2 balconies, interior alterations, and in law suite in the basement.
Applied Mar 12, 2024 · issued Mar 19, 2024 · completed Aug 26, 2024 · Permit 21 177437 HVA (revision 01)
- Closed
Drains and site services · Back water valve (Sewer only)
Installation of backwater valve
Applied Jan 8, 2024 · issued Jan 8, 2024 · completed Jan 11, 2024 · Permit 24 102584 DRN
- Closed
Heating and ventilation
HVAC - Proposal for an addition, new wood deck, 2 balconies, interior alterations, and in law suite in the basement.
Applied Feb 28, 2023 · issued Sep 7, 2023 · completed Aug 26, 2024 · Permit 21 177437 HVA
- Closed
Plumbing
Plumbing - Proposal for an addition, new wood deck, 2 balconies, interior alterations, and in law suite in the basement.
Applied Jun 29, 2021 · issued Sep 7, 2023 · completed Aug 28, 2024 · Permit 21 177437 PLB
- Closed
Small residential project · Multiple projects
Proposal for an addition, new wood deck & interior alterations.
Applied Jun 29, 2021 · issued Sep 7, 2023 · completed Aug 28, 2024 · Permit 21 177437 BLD
- Closed (dormant)
Small residential project · Other
Reconstruction of flat roof to sloped
Applied Jul 24, 2008 · issued Sep 5, 2008 · completed Jun 8, 2026 · Permit 08 186171 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
Proposal for a thrid floor addition with balcony, rear two-storey addition with deck, and an inlaw suite in the basement.
Decision: Approved (hearing Feb 2, 2023)
Filed Feb 28, 2022 · File A0157/22NY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
286 St Clements Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a one-storey front addition.
210 m away · filed Jul 6, 2026 · Approved
220 Briar Hill Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a third storey front addition and one-storey front addition to the existing ground floor together with a new front porch. Please note this application was previously deferred at the July 9, 2026 Committee of Adjustment Public Hearing.
20 m away · filed May 22, 2026 · Deferred
207 St Clements Ave · Minor variance
To construct a one-storey front (vestibule) addition.
170 m away · filed Mar 6, 2026 · Approved
172 Briar Hill Ave · Minor variance
To construct a new dwelling. Further to the previous Public Hearing Notice, an additional variance has been added that was inadvertently missed in conjunction with other revisions, as outlined below.
150 m away · filed Dec 18, 2025 · Approved
243 St Clements Ave · Minor variance
To construct a two-storey detached dwelling with an integral 2-car garage and rear covered porch.
160 m away · filed Oct 21, 2025 · Approved
120 Castlefield Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition.
220 m away · filed Sep 17, 2025 · Approved
158 Albertus Ave · Minor variance
To construct a 3rd storey front addition, a 2 storey rear addition, and rebuild the existing front porch.
240 m away · filed Sep 11, 2025 · Approved
102 Castlefield Ave · Minor variance
To alter the existing driveway, resulting in a reduction in soft landscaping.
240 m away · filed Sep 4, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.