Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 19, Beaches-East York

225 Pickering St

The City of Toronto has 2 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Other

    Proposal to repair structural reinforcement of sagging joists.

    Applied Jun 6, 2025 · issued Jun 10, 2025 · Permit 25 173181 BLD

    Inspections under way
  • Small residential project · Other

    Structural reinforcement of sagging joists

    Applied May 22, 2025 · completed Jun 4, 2025 · Permit 25 163638 BLD

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 2343 Gerrard Street East

    Residential

    100 m away · Condominium · Approved · filed Oct 4, 2022

    Approved
  • 8 Dawes Road

    579 homes · Residential

    480 m away · Site plan · Under review · filed Nov 3, 2022

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 481 Scarborough Rd · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a ground floor deck and stairs.

    240 m away · filed Aug 21, 2026 · Hearing scheduled

  • 499 Scarborough Rd · Minor variance

    To alter the existing one-and-one-half-storey semi-detached dwelling by constructing a front one-storey addition (enclosing the existing front porch into habitable space) with stairs.

    230 m away · filed Apr 7, 2026 · Approved

  • 2345 Gerrard St E · Consent

    To obtain consent to sever the property into two residential lots and to maintain the existing easement/right-of-way.

    80 m away · filed Sep 19, 2025 · Approved

  • 103 Malvern Ave · Minor variance

    To construct a new rear two-storey detached ancillary building (containing two garden suites) with two porches on the south wall.

    210 m away · filed Jul 7, 2025 · Approved

  • 217 Pickering St · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear one-storey addition (including a basement level and walkout) with a wood deck and stairs.

    20 m away · filed Mar 11, 2025 · Approved

  • 504 Scarborough Rd · Minor variance

    To alter the existing one-storey detached dwelling by constructing complete second and third storey additions with covered front and rear balconies, a rear three-storey addition (with a basement level), a front covered porch with stairs, and a rear ground floor covered deck. Also, to construct a rear exterior staircase that will access each level. There will be a total of 4 residential dwelling units on this lot.

    190 m away · filed Mar 11, 2025 · Approved

  • 2333 Gerrard St E · Minor variance

    To construct a new three-storey detached dwelling (fourplex) with a front covered entrance, a rear ground floor terrace, and a rear staircase leading to balconies on all levels. Also, to construct a new one-storey ancillary building (two-car garage) with two parking pads, abutting Hannaford Street. There will be a total of four residential dwelling units on this lot.

    140 m away · filed Sep 11, 2024 · Approved

  • 121 Hannaford St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing new rear stairs. Also, to construct a new ancillary building (detached garage) in the rear yard of the property, abutting the lane. The existing rear deck and detached garage will be demolished.

    100 m away · filed Feb 7, 2024 · Approved

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.