The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Other
To make repairs to an existing foundation wall, including the replacement of an existing timber retaining wall.
Applied Mar 24, 2025 · issued May 1, 2025 · completed Dec 12, 2025 · Permit 25 134010 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
11 storeys · 123 homes · Mixed use
370 m away · Rezoning · Under review · filed Mar 18, 2025
- Approved
- Under review
3 homes · Not stated in the file
500 m away · Condominium · Under review · filed May 16, 2023
Neighbours’ Committee of Adjustment files within 250 m
30 Norway Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition.
230 m away · filed Jun 10, 2026 · Approved
169 Waverley Rd · Minor variance
To construct a new two-storey detached dwelling with a front integral garage, a front covered porch with stairs, and a rear covered ground floor deck.
170 m away · filed Apr 8, 2026 · Approved
28 Hartford Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition.
230 m away · filed Apr 1, 2026 · Approved
113 Bellefair Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear three-storey addition (with a rear ground floor deck), a side (north) one-storey addition (rear extension to the existing attached garage) with a basement walkout, and a dormer on the south side.
180 m away · filed Jan 23, 2026 · Approved
40 Norway Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition.
200 m away · filed Jun 27, 2025 · Approved
75 Herbert Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing rear first and second storey additions.
240 m away · filed Feb 11, 2025 · Approved
69 Bellefair Ave · Minor variance
To construct a new three-storey detached dwelling (duplex) with an integral garage, partially covered front porch with stairs, rear ground floor covered deck with stairs, rear third floor rooftop deck, and a rear basement walkout with a patio. There will be two residential dwelling units within this dwelling.
200 m away · filed Mar 1, 2024 · Approved
69 Bellefair Ave · Consent
To obtain consent to sever the property into two residential lots and to create new easements/rights-of-way.
200 m away · filed Mar 1, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.