Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 19, Beaches-East York

2277 Queen St E

The City of Toronto has 8 building permits since 2017 (8 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Multiple projects

    REV 01 - to interior layour increased the size of commercial units

    Applied Jan 25, 2016 · issued May 2, 2016 · 1 home added · Permit 15 126442 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    HVAC - REV 01 - to HVAC design due to layout changes

    Applied Jan 25, 2016 · issued Feb 16, 2016 · Permit 15 126442 HVA (revision 01)

    Revision issued
  • Plumbing

    Plumbing - to plumbing location due to layout changes

    Applied Jan 25, 2016 · issued Feb 16, 2016 · Permit 15 126442 PLB (revision 01)

    Revision issued
  • Heating and ventilation

    HVAC - Proposal to alter the existing two-storey mixed use semi-detached building by constructing a third floor residential addition and three-storey rear mixed-use addition (Note: the proposal will add an additional two residential units to the existing building - new total 4 residential units). See ZZC 15 103767 and COA.

    Applied Nov 9, 2015 · issued Nov 23, 2015 · Permit 15 126442 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal to alter the existing two-storey mixed use semi-detached building by constructing a third floor residential addition and three-storey rear mixed-use addition (Note: the proposal will add an additional two residential units to the existing building - new total 4 residential units). See ZZC 15 103767 and COA.

    Applied Nov 9, 2015 · issued Nov 23, 2015 · Permit 15 126442 PLB

    Inspections under way
  • Drains and site services

    Drain - Proposal to alter the existing two-storey mixed use semi-detached building by constructing a third floor residential addition and three-storey rear mixed-use addition (Note: the proposal will add an additional two residential units to the existing building - new total 4 residential units). See ZZC 15 103767 and COA.

    Applied Nov 9, 2015 · issued Nov 23, 2015 · Permit 15 126442 DRN

    Inspections under way
  • Fire and security upgrade · Fire alarm

    Proposal to install fire alarms within the entire building. See related building permit 15 126442 BLD.

    Applied Nov 9, 2015 · issued Dec 7, 2015 · Permit 15 249178 FSU

    Inspections under way
  • Addition or alteration · Multiple projects

    Proposal to alter the existing two-storey mixed use semi-detached building by constructing a third floor residential addition and three-storey rear mixed-use addition (Note: the proposal will add an additional two residential units to the existing building - new total 4 residential units). See ZZC 15 103767 and COA.

    Applied Mar 11, 2015 · issued Jul 31, 2015 · 4 homes added · Permit 15 126442 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 52 Balsam Ave · Minor variance

    To maintain the existing two-storey semi-detached dwelling (duplex). There is a total of two residential dwelling units on this lot.

    240 m away · filed Feb 3, 2026 · Postponed

  • 52 Balsam Ave · Minor variance

    To maintain the existing two-storey semi-detached dwelling (duplex). There is a total of two residential dwelling units on this lot.

    240 m away · filed Feb 3, 2026 · Postponed

  • 52 Balsam Ave · Consent

    To obtain consent to sever the property into two residential lots.

    240 m away · filed Feb 3, 2026 · Postponed

  • 8 Douglas Browne Lane · Minor variance

    To construct a new three-storey detached dwelling (fiveplex) with four covered south porch accesses with stairs (units A, B, C, and D) and one covered east porch access with stairs (unit E), four ground floor exterior garden courtyards (units A, C, D, and E), a south one-car integral garage (unit D), three second storey balconies (units A, C, and E), located on the southwest, south and northeast side of the building, as well as four third-storey balconies (units B, D, and E) located on the south, northeast, and north side of the building. This proposal has been reviewed as a building abutting…

    210 m away · filed Nov 7, 2025 · Deferred

  • 99 Scarboro Beach Blvd · Minor variance

    To alter the existing two-storey semi-detached dwelling by replacing the existing rear one-storey addition and decks with a new two-storey addition (including a basement level, and a first level deck with stairs). The existing covered front porch with stairs will be maintained and unaltered.

    60 m away · filed Apr 30, 2025 · Approved

  • 52 Scarboro Beach Blvd · Minor variance

    To maintain the existing two-storey semi-detached dwelling (containing two residential dwelling units), with a front porch, and a front second storey balcony. Also, to maintain the rear one-storey ancillary building (three-car garage).

    220 m away · filed Jan 23, 2025 · Approved

  • 52 Scarboro Beach Blvd · Minor variance

    To maintain the existing two-storey semi-detached dwelling (containing two residential dwelling units), with a front porch, and a front second storey balcony.

    220 m away · filed Jan 23, 2025 · Approved

  • 52 Scarboro Beach Blvd · Consent

    To obtain consent to sever the existing residential lot into two undersized residential lots. Also, to create new easements/rights-of-way and to maintain existing easements/rights-of-way.

    220 m away · filed Jan 23, 2025 · Approved

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.