Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

229 Westwood Ave

The City of Toronto has 3 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal to add a 2nd suite in the basement of an existing semi dwelling. See permit 16 135990 BLD for the basement walkout.

    Applied May 6, 2020 · issued May 6, 2020 · completed Jul 30, 2020 · Permit 17 117109 PLB

    Closed
  • Small residential project · Second suite (New)

    Proposal to add a 2nd suite in the basement of an existing semi dwelling. See permit 16 135990 BLD for the basement walkout.

    Applied Feb 15, 2017 · issued Jul 12, 2019 · completed Dec 30, 2020 · 1 home added · Permit 17 117109 BLD

    Closed
  • Small residential project · Walk-Out stair

    Proposal to construct a rear walkout of existing SFD.

    Applied Apr 5, 2016 · issued Apr 8, 2016 · completed Jul 30, 2020 · Permit 16 135990 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To alter a semi-deached dwelling by adding a secondary suite in the basement therby requiring the need for two parking spaces.

    Decision: Approved (hearing Dec 6, 2017)

    Filed Jun 26, 2017 · File A0842/17TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 245 Gowan Ave · Minor variance

    230 m away · filed Jan 12, 2026 · Application withdrawn

  • 45 Kings Park Blvd · Minor variance

    To alter the existing two-storey detached dwelling by constructing a front second storey addition (above the existing covered front porch).

    200 m away · filed Oct 3, 2025 · Approved

  • 233 Gowan Ave · Minor variance

    To alter the existing two-storey detached dwelling (duplex) by constructing a rear third storey addition. There will be a total of two residential dwelling units on this lot (one unit occupying the ground level, and one unit occupying the second and third levels).

    200 m away · filed Sep 8, 2025 · Approved

  • 193 Mortimer Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by enclosing the existing front porch into habitable space.

    100 m away · filed Feb 19, 2025 · Approved

  • 46 Sammon Ave · Minor variance

    To alter the existing one-and-one-half-storey semi-detached dwelling by constructing a front one-storey addition (enclosing the front porch), a rear two-storey addition, and a rear ground floor covered deck with stairs. The existing rear ground floor landing and stairs will be demolished.

    230 m away · filed May 2, 2024 · Approved

  • 54 Sammon Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a complete second storey addition, a rear two-storey cantilevered addition, a partial front one-storey addition (bay window), a rear ground floor terrace, and a basement secondary suite.

    240 m away · filed Nov 20, 2023 · Approved

  • 169 Woodycrest Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a new front porch, which will be enclosed and to reconstruct the front stairs.

    180 m away · filed Sep 7, 2023 · Approved

  • 185 Gowan Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a detached ancillary building (gazebo) in the rear yard.

    210 m away · filed Oct 11, 2022 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.