Toronto address · Ward 21, Scarborough Centre
23 Bertrand Ave
The City of Toronto has 12 building permits since 2017 (7 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Plumbing · Other
Provide oil interceptor to clean waste water from Pump testing apparatus including submersible pumping station (Waterly Interceptor #2)
Applied Jun 29, 2023 · issued Jul 20, 2023 · Permit 23 167882 PSA
- Closed
Plumbing · Other
Proposal to install oil interceptor to clean waste water from pump testing apparatus
Applied Apr 12, 2022 · issued Apr 22, 2022 · completed Nov 25, 2024 · Permit 22 133542 PSA
- Closed
Addition or alteration · Interior alterations
Proposal for replacement of interior finishes and provision of new ventilation for an open office/workstation area within existing building
Applied Nov 25, 2021 · issued Jan 6, 2022 · completed Jul 20, 2022 · Permit 21 241693 BLD
- Closed
Heating and ventilation
HVAC - Proposal for replacement of interior finishes and provision of new ventilation for an open office/workstation area within existing building
Applied Nov 25, 2021 · issued Jan 6, 2022 · completed Sep 3, 2026 · Permit 21 241693 HVA
- Permit issued
Plumbing · Backflow prevention devices (Water only)
Proposal to replace the existing detective 3" BFP with new
Applied Nov 3, 2021 · issued Nov 5, 2021 · Permit 21 233715 PSA
- Permit issued
Fire and security upgrade · Fire alarm
Proposal to replace the fire alarm control panel in an existing commercial building.
Applied Feb 26, 2021 · issued Mar 3, 2021 · Permit 21 120619 FSU
- Permit issued
Plumbing
Plumbing - Proposal for interior alterations to level 1 and 2 of existing office building.PLB - Proposed relocation of an existing RWL at second floor level only.
Applied Apr 13, 2018 · issued May 28, 2018 · Permit 17 212404 PLB
- Revision issued
Addition or alteration · Interior alterations
REVISION - removal/replacement of interior non-load bearing partitions and floor/wall/ceiling finishes on the ground floor levelProposal for interior alterations to level 1 and 2 of existing office building.
Applied Jan 9, 2018 · issued Feb 6, 2018 · Permit 17 212404 BLD (revision 01)
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations to level 1 and 2 of existing office building.
Applied Aug 8, 2017 · issued Sep 1, 2017 · Permit 17 212404 BLD
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to level 1 and 2 of existing office building.
Applied Aug 8, 2017 · issued Sep 5, 2017 · completed Jul 8, 2026 · Permit 17 212404 HVA
- Permit issued
Plumbing · Backflow prevention devices (Water only)
Installation of a 3" back flow preventer on the east assembly and 4" back flow preventer on the west assembly
Applied Nov 27, 2014 · issued Jan 16, 2015 · Permit 14 257487 PSA
- Cancelled
Addition or alteration · Interior alterations
interior alterations, add/remove partition walls main floor office
Applied Aug 22, 2013 · issued Sep 9, 2013 · completed May 25, 2020 · Permit 13 224586 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
47 storeys · 491 homes · Mixed use
410 m away · Site plan · Under review · filed Apr 8, 2024
- Under appeal
1966-1980 Eglinton Avenue East
48 storeys · 2,434 homes · Mixed use
500 m away · Subdivision · Under appeal · filed Aug 9, 2021
Neighbours’ Committee of Adjustment files within 250 m
10 Bertrand Ave · Minor variance
To construct a new six-storey self-storage building and permit the use of self-storage. The three existing one-storey buildings will remain.
230 m away · filed Sep 4, 2025 · Approved
939 Warden Ave · Minor variance
To permit the required rear yard setback to be reduced for the existing building and one-storey, 183 square metre addition to the east side of the existing warehouse building. The Committee of Adjustment deferred this application at the hearing of January 30, 2019. The application has been revised by removing a variance to reduce the parking requirement.
250 m away · filed Jul 28, 2017 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.