Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

23 Fielding Ave

The City of Toronto has 7 building permits since 2017 (5 still open) and 2 Committee of Adjustment files on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC REV - New 3rd floor

    Applied Sep 22, 2023 · issued Oct 5, 2023 · Permit 20 189001 HVA (revision 01)

    Revision issued
  • Small residential project · Multiple projects

    REV - revision to the building permit # 20 189001 BLD 00 SRNew 3rd floor addition and new rear deck

    Applied Sep 22, 2023 · issued Oct 27, 2023 · Permit 20 189001 BLD (revision 01)

    Revision issued
  • Plumbing

    Plumbing REV - New 3rd floor

    Applied Sep 22, 2023 · issued Sep 25, 2023 · completed May 15, 2024 · Permit 20 189001 PLB (revision 01)

    Closed
  • Plumbing

    Plumbing - To construct two storey rear addition, interior alterations, rear deck and basement underpinning

    Applied Sep 2, 2020 · issued Oct 14, 2020 · completed May 15, 2024 · Permit 20 189001 PLB

    Closed
  • Drains and site services

    Drain - To construct two storey rear addition, interior alterations, rear deck and basement underpinning

    Applied Sep 2, 2020 · issued Oct 14, 2020 · Permit 20 189001 DRN

    Inspections under way
  • Heating and ventilation

    HVAC - To construct two storey rear addition, interior alterations, rear deck and basement underpinning

    Applied Sep 2, 2020 · issued Oct 22, 2020 · Permit 20 189001 HVA

    Inspections under way
  • Small residential project · Multiple projects

    Proposal for underpinning, interior alterations and a new rear deck.

    Applied Sep 2, 2020 · issued Oct 14, 2020 · Permit 20 189001 BLD

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing two-storey semi-detached dwelling by constructing a rear third storey addition and a new rear ground floor deck with stairs. The existing one-storey rear addition will be demolished.

    Decision: Approved (hearing Jul 12, 2023)

    Filed Apr 24, 2023 · File A0411/23TEY

    Closed
  • Minor variance · NR addition

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, a rear ground floor deck and a rear detached garage.

    Decision: Refused (hearing Jun 2, 2021)

    Filed Dec 18, 2020 · File A1183/20TEY

    TLAB appeal

What’s planned nearby

Development sites within 500 m

  • 975 Danforth Avenue

    10 storeys · 57 homes · Mixed use

    210 m away · Site plan · Under review · filed May 12, 2022

    Under review
  • 1095-1111 Danforth Avenue

    13 storeys · Mixed use

    360 m away · Site plan · Approved · filed Mar 24, 2022

    Approved
  • 1117 Danforth Avenue

    14 storeys · 81 homes · Mixed use

    410 m away · Site plan · Approved · filed Oct 1, 2024

    Approved
  • 184 Chatham Avenue

    4 storeys · 42 homes · Residential

    410 m away · Site plan · Approved · filed Jun 25, 2024

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 98 Dewhurst Blvd · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear third storey addition.

    190 m away · filed May 26, 2026 · Approved

  • 40 Donlands Ave · Minor variance

    To alter the existing two-storey Place of Worship (Greek Orthodox Church) by constructing a two-storey addition (elevator vestibule) at the northeast corner of the building.

    90 m away · filed Feb 27, 2026 · Approved

  • 87 Strathmore Blvd · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a ground floor deck.

    230 m away · filed Aug 18, 2025 · Approved

  • 41 Dewhurst Blvd · Minor variance

    To permit the existing two-and-one-half-storey semi-detached dwelling by constructing a rear one-storey addition with a deck and stairs. There will be a total of two residential dwelling units on this lot (one unit occupying the basement and first storey, and one unit occupying the second and third storeys).

    60 m away · filed Jun 19, 2025 · Approved

  • 30 Milverton Blvd · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition with a rooftop deck (above the second storey), a rear two-storey addition, and a rear ground floor deck with stairs and a patio at-grade (the existing rear ground floor deck will be demolished). Also, to construct a one-storey ancillary building (shed) in the rear yard of the property.

    240 m away · filed Feb 7, 2025 · Approved

  • 20 Strathmore Blvd · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by converting the existing attic into habitable space.

    50 m away · filed Jan 22, 2025 · Approved

  • 87 Strathmore Blvd · Minor variance

    To legalize and to maintain the existing one-storey ancillary building (detached garage), in the rear yard, abutting the laneway.

    230 m away · filed Apr 13, 2023 · Approved

  • 53 Milverton Blvd · Minor variance

    To alter the existing two-storey semi-detached dwelling by converting the front covered porch into habitable space, with a covered porch, and a second storey balcony. Also, to legalize and to maintain the existing rear one-storey addition, an exterior staircase, and a basement walkout, which was constructed without an authorized building permit.

    200 m away · filed Jan 20, 2023 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.