Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

23 Myrtle Ave

The City of Toronto has 2 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal to convert single family rowhouse to two unit dwelling with altteration on second floor.

    Applied Feb 8, 2024 · issued Feb 8, 2024 · completed Sep 22, 2024 · Permit 24 100950 PLB

    Closed
  • Small residential project · Interior alterations

    Proposal to convert single family rowhouse to two unit dwelling with altteration on second floor.

    Applied Jan 4, 2024 · issued Jan 8, 2024 · completed Mar 5, 2024 · 1 home added · Permit 24 100950 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 59 Boultbee Ave · Minor variance

    To construct a new three-storey dwelling (duplex) with separate front integral garages, rear ground floor decks, and rear third storey balconies.

    170 m away · filed May 2, 2024 · Approved

  • 17 Myrtle Ave · Minor variance

    To alter the existing one-storey ancillary building (a detached garage abutting the laneway) by constructing a cantilevered second storey addition, to contain a laneway suite.

    20 m away · filed Nov 10, 2023 · Refused

  • 17 Myrtle Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing front and rear two-storey additions (including basement), a second storey side addition, a complete third storey addition with a rear rooftop deck, a front porch and steps, and a rear ground floor deck and stairs. The existing ancillary building (detached garage) in the rear yard, will be maintained.

    20 m away · filed Apr 25, 2023 · Approved

  • 347 Jones Ave · Consent

    To obtain consent for a technical severance to re-establish two residential lots which merged on title.

    180 m away · filed Dec 23, 2022 · Approved

  • 352 Jones Ave · Minor variance

    To convert the existing two-storey detached dwelling from one-unit into four-units (one primary unit on the ground level and three secondary suites (one within the basement and one on each of the second and third levels)), by constructing a third storey addition, a rear basement walkout, and rear second and third storey balconies. Also, to construct a new two-storey ancillary building (garden suite) located in the rear yard.

    230 m away · filed Nov 8, 2022 · Approved

  • 272 Hastings Ave · Minor variance

    To construct a new three-storey detached dwelling with a front covered porch, front and rear third floor terraces, a second floor south side balcony, and a rear ground floor deck. Also, to construct a one-storey ancillary building (detached garage with a north side walk-out amenity space) in the rear yard, abutting the laneway.

    240 m away · filed Jul 15, 2022 · Approved

  • 88 1/2 Boultbee Ave · Minor variance

    To legalize and to maintain the existing one-storey ancillary building in the rear yard, that was constructed without the benefit of a building permit.

    230 m away · filed Jun 9, 2022 · Approved

  • 147 Galt Ave · Minor variance

    To alter the existing dwelling by contructing a front basement walkout.

    160 m away · filed Mar 31, 2022 · Application withdrawn

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.