Toronto address · Ward 21, Scarborough Centre
23 Twin Pauls Cres
The City of Toronto has 9 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Interior alterations
REVISION01: Revision of previous PERMITBasement: Interior alteration kitchen & Living room location change, utility room size change, laundry space added; 1st foor: Interior alteration, bedroom-2 door added, front porch size change, front door location change, Pantry and bathroom location swapped, primary bedroom walk in closet size change; 2nd floor: Furnace added; attic access inside closet added; bathroom & walk in closet size alteration.Proposal to convert basement to third unit.
Applied Jan 9, 2025 · issued Jan 29, 2025 · completed Jul 29, 2025 · Permit 24 236903 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Proposal to convert basement to third unit.
Applied Dec 30, 2024 · issued Jan 22, 2025 · completed Jul 29, 2025 · Permit 24 236903 HVA
- Closed
Small residential project · Interior alterations
Proposal to convert basement to third unit.
Applied Nov 8, 2024 · issued Dec 12, 2024 · completed Jul 29, 2025 · 1 home added · Permit 24 236903 BLD
- Closed
Plumbing · Other
Proposal to install stand-alone plumbing.
Applied Oct 8, 2024 · issued Nov 5, 2024 · completed Jul 29, 2025 · Permit 24 223709 PSA
- Cancelled
Small residential project · Multiple projects
Proposal to convert basement to third unit.
Applied Sep 11, 2024 · completed Oct 4, 2024 · 1 home added · Permit 24 211090 BLD
- Cancelled
Plumbing
Plumbing - Proposal to convert basement to third unit.
Applied Sep 11, 2024 · completed Oct 4, 2024 · Permit 24 211090 PLB
- Closed
Heating and ventilation
HVAC - Proposal to construct a 2nd-storey and rear addition to create a second unit, interior alterations (basement and main floor), new below grade basement walkout, new front porch and rear deck.
Applied Apr 22, 2024 · issued Jun 28, 2024 · completed Jul 28, 2025 · Permit 24 138963 HVA
- Closed
Small residential project · Multiple projects
Proposal to construct a 2nd-storey and rear addition to create a second unit (duplex), interior alterations (basement and main floor), new below grade basement walkout, new front porch and rear deck.
Applied Apr 22, 2024 · issued Jun 28, 2024 · completed Jul 28, 2025 · 2 homes added · Permit 24 138963 BLD
- Closed
Plumbing
Plumbing - Proposal to construct a 2nd-storey and rear addition to create a second unit, interior alterations (basement and main floor), new below grade basement walkout, new front porch and rear deck.
Applied Apr 22, 2024 · issued Jun 28, 2024 · completed Jul 15, 2025 · Permit 24 138963 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
1 Ellington Drive and 2102 Lawrence Avenue East
11 storeys · 100 homes · Residential
440 m away · Site plan · Under review · filed Mar 7, 2025
Neighbours’ Committee of Adjustment files within 250 m
1251 Warden Ave · Minor variance
To construct a new six-storey apartment building. There will be a total of 25 dwelling units on the property, and the existing dwelling will be demolished.
240 m away · filed Aug 24, 2026 · Hearing scheduled
37 Twin Pauls Cres · Minor variance
To legalize and maintain the construction of a two-storey addition and deck in the rear north yard. NOTE: This application was previously deferred at the Committee of Adjustment Hearing on March 11, 2026.
110 m away · filed Jan 13, 2026 · Approved
90 Ellington Dr · Minor variance
To construct an ancillary roof structure above the existing deck in the rear east yard. There will be no change to the existing dwelling.
190 m away · filed Jan 9, 2026 · Approved
1207 Warden Ave · Minor variance
To construct a new two-storey garden suite (garage on the ground floor and dwelling unit above) in the rear yard of the lot containing the existing two-storey detached main dwelling. The existing detached garage will be demolished. There will be a total of 2 dwelling units on the lot. NOTE: This application was previously deferred at the Committee of Adjustment hearing on September 18, 2024.
240 m away · filed Jun 4, 2024 · Approved
82 Ainsdale Rd · Minor variance
To construct a 2-storey dwelling.
190 m away · filed Nov 28, 2023 · Approved
90 Ellington Dr · Minor variance
To construct interior alterations, rear and second floor addition and a secondary suite in the basement.
190 m away · filed Jun 9, 2023 · Approved
1207 Warden Ave · Minor variance
To construct a second storey above the existing dwelling. Also to construct a two storey side addition and a detached garage.
240 m away · filed Jul 15, 2022 · Approved
11 Twin Pauls Cres · Minor variance
To construct an all seasons room on existing front porch and to add a rear yard second storey balcony.
70 m away · filed Jan 25, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.