Toronto address · Ward 22, Scarborough-Agincourt

2350 Bridletowne Crcl

The City of Toronto has 6 building permits since 2017 (5 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposed replacement of existing 175kw diesel generator with new in the same room including ATS with associated emergency distribution equipment and all related mechanical systems. replacement of standpipe fire pump with new including controller and ATS. Sprinkler branch extension.

    Applied Nov 18, 2025 · issued Jan 13, 2026 · Permit 25 255678 HVA

    Permit issued
  • Addition or alteration · Multiple projects

    Proposed replacement of existing 175kw diesel generator with new in the same room including ATS with associated emergency distribution equipment and all related mechanical systems. replacement of standpipe fire pump with new including controller and ATS. Sprinkler branch extension.

    Applied Nov 18, 2025 · issued Jan 6, 2026 · Permit 25 255678 BLD

    Permit issued
  • Heating and ventilation · Alter: Boiler/Furnace/AC replacement

    Replacement of Recreation/Pool area air-handling units and heating boilers.

    Applied Oct 31, 2025 · issued Dec 1, 2025 · Permit 25 247352 MSA

    Permit issued
  • Addition or alteration · Garage Repair/Reconstruction

    Proposal for localized concrete repairs to the parking garage and replacement of the ramp topping and heating system of an existing apartment building.

    Applied Feb 21, 2024 · issued May 3, 2024 · Permit 24 117296 BLD

    Permit issued
  • Fire and security upgrade · Fire alarm

    fire alarm upgrade 24 floors

    Applied Mar 25, 2013 · issued Apr 16, 2013 · Permit 13 140004 FSU

    Permit issued
  • Addition or alteration · Balcony/Guard repairs

    Repair 88 Balconies

    Applied Aug 7, 2009 · issued Sep 23, 2009 · completed Jun 8, 2026 · Permit 09 154983 BLD

    Closed (dormant)

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

None on file since 2017.

Everything planned in Scarborough-Agincourt

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.