Toronto address · Ward 7, Humber River-Black Creek
2362 Finch Ave W
The City of Toronto has 12 building permits since 2017 (9 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Addition or alteration · Interior alterations
Interior alterations to existing restaurant - McDonald's
Applied Jul 23, 2024 · issued Aug 9, 2024 · Permit 24 186333 BLD
- Permit issued
Heating and ventilation
HVAC - Interior alterations to existing restaurant - McDonald's
Applied Jul 23, 2024 · issued Oct 28, 2024 · Permit 24 186333 HVA
- Permit issued
Plumbing
Plumbing - Interior alterations to existing restaurant - McDonald's
Applied Jul 23, 2024 · issued Oct 28, 2024 · Permit 24 186333 PLB
- Closed
Designated structure · Sign building permit related
To modify one existing illuminated ground sign**McDonalds**
Applied Jul 20, 2022 · issued Mar 21, 2023 · completed Aug 4, 2023 · Permit 22 179626 DST
- Closed
Designated structure · Sign building permit related
The applicant has proposed to erect and display four electronic ground signs displaying electronic moving copy associated with a drive-through facility on the premises, two with a sign face measuring 1.46 metres by 1.26 metres, with an overall height of 2.11 metres, and two with a sign face measuring 0.73 metres by 1.26 metres with an overall height of 2.11 metres. *MCDONALD'S*As per SMP 19-102390
Applied Apr 23, 2019 · issued May 8, 2019 · completed Oct 3, 2019 · Permit 19 143192 DST
- Inspections under way
Plumbing · Other
Grease trap interceptor replacement "Mcdonald's Restaurant"
Applied Sep 14, 2018 · issued Oct 15, 2018 · Permit 18 225596 PSA
- Inspections under way
Addition or alteration · Addition(s)
Proposal for a freezer/cooler expansion/addition to existing McDonald's Restaurant
Applied Oct 8, 2013 · issued Oct 29, 2013 · Permit 13 248099 BLD
- Closed
Heating and ventilation · Special ventilation system
(1) kitchen exhaust to existing *McDonalds Restaurant*
Applied Mar 4, 2011 · issued Aug 3, 2011 · completed Sep 9, 2026 · Permit 11 138884 MSA
- Inspections under way
Plumbing
Plumbing - Interior alterations - to reconfigure an existing layout of MacDonald's Restaurant.
Applied Aug 10, 2010 · issued Sep 15, 2010 · Permit 10 236891 PLB
- Inspections under way
Heating and ventilation
HVAC - Interior alterations - to reconfigure an existing layout of McDonald's Restaurant.
Applied Aug 10, 2010 · issued Sep 15, 2010 · Permit 10 236891 HVA
- Inspections under way
Addition or alteration · Interior alterations
Interior alterations - to reconfigure an existing layout of McDonalds Restaurant.
Applied Aug 10, 2010 · issued Aug 26, 2010 · Permit 10 236891 BLD
- Inspections under way
Addition or alteration · Re-Roofing/Re-Cladding
Renovations of an exterior facade including recladding of walls to an existing McDonald's Restaurant.For interior alterations, see 10-236891
Applied Aug 10, 2010 · issued Aug 26, 2010 · Permit 10 236910 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
38 storeys · 1,275 homes · Mixed use
130 m away · Subdivision · Approved · filed Sep 12, 2021
- Under review
2405 Finch Avenue West and 3400 Weston Road
30 storeys · 403 homes · Residential
160 m away · Site plan · Under review · filed Dec 31, 2024
- Approved
35 storeys · 832 homes · Residential
250 m away · Rezoning · Approved · filed May 21, 2024
Neighbours’ Committee of Adjustment files within 250 m
2350 Finch Ave W · Minor variance
To permit a personal service shop (hair salon) within the existing mixed use building.
60 m away · filed Jul 13, 2017 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.