Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 25, Scarborough-Rouge Park

24 Atkinson Ave

The City of Toronto has 8 building permits since 2017 (7 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    Revision: Revised drawingsRevision 02: Changes to layout. Rev 01 - changes to layout (Cancelled)HVAC - Proposal for rear addition and interior alterations.

    Applied Jun 9, 2026 · issued Jul 6, 2026 · Permit 24 249949 HVA (revision 03)

    Revision issued
  • Heating and ventilation

    Revision 02: Changes to layout. Rev 01 - changes to layout (Cancelled)HVAC - Proposal for rear addition and interior alterations.

    Applied Feb 12, 2026 · completed Mar 24, 2026 · Permit 24 249949 HVA (revision 02)

    Cancelled
  • Plumbing

    Plumbing Revision 01 - Revision to relocate second-floor bathroom, second-floor paritially raise roof.-----------------------------------------------------------------Plumbing - Proposal for rear addition and interior alterations.

    Applied Dec 19, 2025 · issued Jan 6, 2026 · Permit 24 249949 PLB (revision 01)

    Revision issued
  • Small residential project · Multiple projects

    Revision 02 - Revision to relocate second-floor bathroom, second-floor paritially raise roof.-----------------------------------------------------------------Revision 01: Proposal to revise interior layout, second floor addition and underpinning.Proposal for rear addition and interior alterations.

    Applied Dec 19, 2025 · issued Jan 16, 2026 · Permit 24 249949 BLD (revision 02)

    Revision issued
  • Plumbing

    Plumbing - Proposal for rear addition and interior alterations.

    Applied Jul 25, 2025 · issued Aug 1, 2025 · Permit 24 249949 PLB

    Inspections under way
  • Small residential project · Multiple projects

    Revision 01: Proposal to revise interior layout, second floor addition and underpinning.Proposal for rear addition and interior alterations.

    Applied Jul 25, 2025 · issued Sep 30, 2025 · Permit 24 249949 BLD (revision 01)

    Revision issued
  • Small residential project · Multiple projects

    Proposal for rear addition and interior alterations.

    Applied Dec 12, 2024 · issued Feb 5, 2025 · Permit 24 249949 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for rear addition and interior alterations.

    Applied Dec 12, 2024 · issued Feb 5, 2025 · Permit 24 249949 HVA

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 4439 Lawrence Ave E · Minor variance

    To construct a new three-storey detached dwelling with a secondary suite in the basement.

    230 m away · filed Feb 18, 2021 · Deferred

  • 262 Beechgrove Dr · Minor variance

    To construct a secondary suite in the basement of the existing single family dwelling.

    200 m away · filed Jan 25, 2019 · Deferred

  • 260 Beechgrove Dr · Minor variance

    This application is for consent to sever the land into three residential lots, shown as Parts 1, 2 and 3 on the attached Lot Division Plan. Part 1 would have a frontage of 17.9 m on Lawrence Ave E. and a lot area of 416 m2. Part 2 would have a frontage of 12 m on Beechgrove Drive and a lot area of 482 m2. Part 3 would have frontage on Beechgrove Drive and Lawrence Avenue E., and a lot area of 415 m2. [The Committee of Adjustment approved an application to sever this property into three lots in August, 2010, however, the owners did not fulfill the conditions of consent within one year and the…

    210 m away · filed Oct 3, 2013 · Deferred

Everything planned in Scarborough-Rouge Park

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.