Toronto address · Ward 1, Etobicoke North
24 Braywin Dr
The City of Toronto has 6 building permits since 2017 (2 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
New house · New building
REV01: Proposed revision for underpinningProposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 23 140885 DEM, 22 161181 ZAP, 22 210764 MV and Final and Binding A0569/22EYK.
Applied Oct 13, 2023 · issued Nov 10, 2023 · Permit 23 140900 BLD (revision 01)
- Inspections under way
New house · New building
Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 23 140885 DEM, 22 161181 ZAP, 22 210764 MV and Final and Binding A0569/22EYK.
Applied May 3, 2023 · issued May 31, 2023 · 1 home added · Permit 23 140900 BLD
- Closed
Heating and ventilation
HVAC - Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 23 140885 DEM, 22 161181 ZAP, 22 210764 MV and Final and Binding A0569/22EYK.
Applied May 3, 2023 · issued May 31, 2023 · completed Sep 19, 2025 · Permit 23 140900 HVA
- Closed
Plumbing
Plumbing - Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 23 140885 DEM, 22 161181 ZAP, 22 210764 MV and Final and Binding A0569/22EYK.
Applied May 3, 2023 · issued May 31, 2023 · completed Sep 19, 2025 · Permit 23 140900 PLB
- Closed
Demolition
Proposal to demolish the existing 1 storey SFD-detached dwelling.
Applied May 3, 2023 · issued May 31, 2023 · completed Jul 26, 2024 · 1 home removed · Permit 23 140885 DEM
- Closed
Drains and site services
Drain - Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 23 140885 DEM, 22 161181 ZAP, 22 210764 MV and Final and Binding A0569/22EYK.
Applied May 3, 2023 · issued May 31, 2023 · completed Sep 19, 2025 · Permit 23 140900 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To construct a new detached dwelling with an attached garage.
Decision: Approved (hearing Jan 26, 2023)
Filed Sep 29, 2022 · File A0569/22EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
2 Braywin Dr · Minor variance
To construct a new one-storey side addition to the existing dwelling.
220 m away · filed Mar 6, 2025 · Approved
16 Braywin Dr · Minor variance
To construct a second storey addition above the existing dwelling, a covered front porch, and a rear second storey platform.
70 m away · filed Nov 21, 2024 · Approved
29 Braywin Dr · Minor variance
To construct a new detached dwelling with an attached garage.
60 m away · filed Feb 12, 2024 · Approved
51 Braywin Dr · Minor variance
To construct a one-storey rear addition, a partial second storey addition, a new front porch and a rear yard deck.
210 m away · filed Apr 3, 2023 · Approved
22 Braywin Dr · Minor variance
Proposed installation of a new pool and fence enclosure in the rear yard of the existing SFD-detached dwelling. See related permit 20 193384 BLD.
30 m away · filed Mar 1, 2021 · Postponed
14 Braywin Dr · Minor variance
To construct a new detached dwelling with an attached garage.
90 m away · filed Dec 11, 2017 · Approved
5 Golfwood Hts · Minor variance
To construct a cantilevered second storey addition above the existing garage which will contain a secondary suite. The existing attached garage will be converted into habitable space.
240 m away · filed Jun 20, 2017 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.