Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 11, University-Rosedale

24 Douglas Cres

The City of Toronto has 1 Committee of Adjustment file on record for this address.

Building permits

The City lists no building permits for this address since 2017, and none still open from before.

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new two-storey detached dwelling with a front second storey juliet balcony, an east side covered porch, west side basement walkouts, a rear ground floor terrace, and a rear in-ground swimming pool. Also, to construct a new rear one-storey ancillary building (detached garage with a driveway), abutting Douglas Crescent.

    Decision: Refused (hearing May 21, 2025)

    Filed Feb 28, 2025 · File A0179/25TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 44 Douglas Cres · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear basement addition with a ground floor concrete covered deck above.

    40 m away · filed Dec 4, 2025 · Approved

  • 23 Douglas Cres · Minor variance

    To construct a new three-storey detached dwelling with a front integral garage, a covered front porch, a rear walk-out basement, a rear raised patio (a portion will be covered), a rear third storey balcony, and a rear yard swimming pool.

    60 m away · filed Mar 6, 2024 · Approved

  • 51 Douglas Cres · Minor variance

    To alter the existing two-storey detached dwelling by constructing a two-storey rear addition, and a rear deck. Also, to construct a new one-storey ancillary building (workshop and storage area) in the rear yard. The existing one-storey rear addition, rear deck, and garage will be demolished.

    90 m away · filed Aug 26, 2022 · Approved

  • 4 Douglas Cres · Minor variance

    To construct a new two-storey detached dwelling with and integral garage, rear basement walkout, and a rear second floor balcony.

    120 m away · filed Dec 3, 2019 · Approved

  • 4 Douglas Cres · Minor variance

    To construct a new three-storey detached dwelling with integral garage.

    120 m away · filed Nov 23, 2018 · Refused

  • 20 Douglas Cres · Minor variance

    To construct a new two-storey detached dwelling.

    30 m away · filed Dec 5, 2017 · Approved

Everything planned in University-Rosedale

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.