Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

24 Hector Ave

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Backwater valve installation (sewer only)

    Applied Jul 23, 2020 · issued Jul 23, 2020 · completed Jul 29, 2020 · Permit 20 171521 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 287-291 Christie Street

    9 storeys · 65 homes · Mixed use

    450 m away · Site plan · Approved · filed Feb 22, 2022

    Approved
  • 569-573 Christie Street

    3 storeys · Residential

    470 m away · Site plan · Under review · filed Dec 6, 2021

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 4 Braemore Gdns · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition (at the northeast portion of the dwelling) with a ground floor deck and stairs (including an outdoor kitchen and planter box).

    210 m away · filed Apr 30, 2026 · Approved

  • 911 Davenport Rd · Minor variance

    To permit the existing two-storey detached non-residential building, which will contain office use (on all levels), retail use (on all levels), an art gallery (within the basement and on the first level), and an eating establishment (within the basement and on the first level).

    70 m away · filed Jun 3, 2025 · Approved

  • 231 Ashworth Ave · Minor variance

    To alter the existing three-storey detached dwelling by constructing a rear one-storey addition (including a basement level) with a ground floor deck and stairs.

    190 m away · filed Jan 24, 2025 · Approved

  • 16 Rains Ave · Minor variance

    To permit the existing one-storey ancillary building (detached garage) by converting the space into a garden suit and to construct a partial second storey addition for storage space.

    90 m away · filed Aug 24, 2023 · Approved

  • 4 Conrad Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a front covered porch extension, a rear two-storey addition, a rear third storey dormer addition, a south side carport roof structure, and a rear covered ground floor deck. Also, the existing one-storey ancillary building (detached garage), in the rear yard, will be maintained and unaltered.

    250 m away · filed Aug 5, 2023 · Approved

  • 509 Christie St · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear second and third storey deck. The existing ancillary building (detached garage), in the rear yard, will be maintained and unaltered.

    230 m away · filed Jan 25, 2023 · Approved

  • 890 Davenport Rd · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a third storey addition, a rear three-storey addition, and a front third storey balcony.

    190 m away · filed Jul 27, 2022 · Approved

  • 218 Ashworth Ave · Minor variance

    To alter the existing three-storey semi-detached dwelling by constructing a new two-storey rear addition with a ground floor deck and a third storey addition. Also, to construct a one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.

    220 m away · filed Apr 22, 2022 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.