Toronto address · Ward 14, Toronto-Danforth
24 Mc Gee St
The City of Toronto has 14 building permits since 2017 (10 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Fire and security upgrade · Sprinklers
Proposal to install new sprinkler system in the existing office building.
Applied Jul 11, 2019 · issued Aug 12, 2019 · completed May 13, 2021 · Permit 19 187153 FSU
- Revision issued
Drains and site services · Site service
Revision #1: Proposed 200 mm sanitary Proposed watermain upgrade to existing non-residential building
Applied Apr 23, 2019 · issued Jun 10, 2019 · Permit 18 200303 STS (revision 01)
- Cancelled
Heating and ventilation
Revision #01 - Changes to interior layout. HVAC - Proposal to construct interior alterations to convert from industrial to office -Tenant B-
Applied Apr 1, 2019 · completed Sep 30, 2020 · Permit 18 202598 HVA (revision 01)
- Revision issued
Addition or alteration · Interior alterations
Revision #01 - Changes to interior layout.Proposal for interior alterations to existing manufacturing use -Tenant B-
Applied Apr 1, 2019 · issued May 27, 2019 · Permit 18 202598 BLD (revision 01)
- Revision issued
Heating and ventilation
REV01: Revision to permit 18-141075 BLD as per bubbled areas. HVAC - Proposal for interior alterations to convert from industrial to office - Tenant "A"
Applied Aug 22, 2018 · issued Oct 22, 2018 · Permit 18 141075 HVA (revision 01)
- Revision issued
Addition or alteration · Interior alterations
REV01: Revision to permit 18-141075 BLD as per bubbled areas. Proposal for interior alterations to existing manufacturing use, and construction of new service platform - Tenant "A"
Applied Aug 22, 2018 · issued Nov 23, 2018 · Permit 18 141075 BLD (revision 01)
- Inspections under way
Plumbing
Plumbing - Proposal to construct interior alterations to convert from industrial to office -Tenant B-
Applied Jul 31, 2018 · issued Oct 3, 2018 · Permit 18 202598 PLB
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations to existing manufacturing use -Tenant B-
Applied Jul 31, 2018 · issued Oct 3, 2018 · Permit 18 202598 BLD
- Closed
Heating and ventilation
HVAC - Proposal to construct interior alterations to convert from industrial to office -Tenant B-
Applied Jul 31, 2018 · issued Oct 3, 2018 · completed Oct 31, 2025 · Permit 18 202598 HVA
- Permit issued
Drains and site services · Site service
Proposed watermain upgrade to existing non-residential building
Applied Jul 26, 2018 · issued Sep 7, 2018 · Permit 18 200303 STS
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations to existing manufacturing use, and construction of new service platform - Tenant "A"
Applied Apr 10, 2018 · issued Jun 19, 2018 · Permit 18 141075 BLD
- Inspections under way
Heating and ventilation
HVAC - Proposal for interior alterations to convert from industrial to office - Tenant "A"
Applied Apr 10, 2018 · issued Jun 19, 2018 · Permit 18 141075 HVA
Show 2 more permits
- Closed
Plumbing
Plumbing - Proposal for interior alterations to convert from industrial to office - Tenant "A"
Applied Apr 10, 2018 · issued Jun 19, 2018 · completed Dec 14, 2018 · Permit 18 141075 PLB
- Inspections under way
Addition or alteration · Multiple projects
Proposal for basement underpinning in an existing warehouse building.
Applied Apr 6, 2018 · issued May 15, 2018 · Permit 18 139491 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
462 Eastern Avenue and 150 Logan Avenue
1 storeys · Residential
250 m away · Condominium · Approved · filed Oct 21, 2024
- Approved
6 storeys · 15 homes · Mixed use
270 m away · Site plan · Approved · filed Apr 28, 2023
- Under appeal
18-40 Lewis Street, 21-53 Broadview Avenue and 344 Eastern Avenue
12 storeys · 340 homes · Mixed use
330 m away · Site plan · Under appeal · filed Jul 5, 2022
- Approved
9 storeys · 78 homes · Mixed use
440 m away · Site plan · Approved · filed May 3, 2023
- Under review
30 Booth Avenue, 21 Don Valley Parkway and 433 Eastern Avenue
48 storeys · Residential
450 m away · Site plan · Under review · filed Apr 27, 2023
Neighbours’ Committee of Adjustment files within 250 m
64 Saulter St · Minor variance
To alter the existing two-storey row house dwelling by constructing a complete third storey addition (attic space which will be used as habitable space).
200 m away · filed Nov 13, 2025 · Approved
18 Mc Gee St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a front porch canopy, a front second storey addition, and a complete third storey addition.
40 m away · filed Oct 2, 2025 · Approved
14 Mc Gee St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a complete third storey addition.
50 m away · filed Jul 10, 2025 · Approved
44 Saulter St · Minor variance
To alter the existing two-storey townhouse dwelling (with two residential dwelling units) by constructing a new rear second storey deck with stairs.
170 m away · filed Feb 12, 2024 · Approved
16 Mc Gee St · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a partial rear two-storey addition, a partial rear third storey addition with a rear deck, and a new front porch with stairs and an accessibility lift.
40 m away · filed Aug 1, 2023 · Approved
118 Booth Ave · Minor variance
To convert the existing two-storey semi-detached dwelling from three-units into two-units by constructing a rear second storey addition, front ground floor stairs and to enclose the front porch.
170 m away · filed Dec 21, 2022 · Approved
163 Booth Ave · Minor variance
To construct a new three-storey detached dwelling with a sunken front walkout, a rear lower courtyard, and a second storey rear deck. Also, to permit the construction of a two-storey ancillary building (laneway suite), currently under a separate building permit, in the rear yard, abutting the laneway.
220 m away · filed Jul 8, 2022 · Approved
43 Mc Gee St · Minor variance
To alter the existing one-storey townhouse by constructing a rear one-storey addition, a complete second storey addition, and a third storey addition with a rooftop deck. Also, to reconstruct the front porch.
70 m away · filed Jun 9, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.