Toronto address · Ward 16, Don Valley East
24 Tangmere Rd
The City of Toronto has 6 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposal to construct a new 2 storey single family dwelling and demolish the existing 1 storey single family dwelling
Applied Feb 1, 2021 · issued Apr 1, 2021 · completed Dec 21, 2022 · Permit 21 111258 HVA
- Closed
Plumbing
Plumbing - Proposal to construct a new 2 storey single family dwelling and demolish the existing 1 storey single family dwelling
Applied Feb 1, 2021 · issued Apr 1, 2021 · completed Dec 21, 2022 · Permit 21 111258 PLB
- Closed
New house · New building
Proposal to construct a new 2 storey single family dwelling and demolish the existing 1 storey single family dwelling
Applied Feb 1, 2021 · issued Apr 1, 2021 · completed Dec 21, 2022 · 1 home added · Permit 21 111258 BLD
- Closed
Demolition
Proposal to demolish existing 1 storey single family dwelling to construct a new 2 storey single family dwelling
Applied Feb 1, 2021 · issued Apr 1, 2021 · completed Dec 21, 2022 · 1 home removed · Permit 21 111280 DEM
- Closed
Drains and site services
Drain - Proposal to construct a new 2 storey single family dwelling and demolish the existing 1 storey single family dwelling
Applied Feb 1, 2021 · issued Apr 1, 2021 · completed Dec 21, 2022 · Permit 21 111258 DRN
- Closed
Small residential project · Pool fence enclosure
To intall a pool enclosure fence
Applied Aug 30, 2018 · issued Sep 20, 2018 · completed Sep 20, 2018 · Permit 18 217682 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To construct a new detached dwelling with an integral garage.
Decision: Approved (hearing Nov 10, 2020)
Filed Aug 20, 2020 · File A0429/20NY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
22 Tangmere Rd · Minor variance
To redesign and extend the existing porch. Please note, the application was deferred on August 1, 2024.
10 m away · filed Jun 12, 2024 · Approved
1 Tangmere Rd · Minor variance
To construct a side addition and second storey addition to the existing dwelling, in conjunction with other interior and exterior alterations.
160 m away · filed Apr 11, 2024 · Approved
26 Tremont Cres · Minor variance
To construct a new dwelling.
180 m away · filed May 4, 2023 · Approved
3 Talwood Dr · Consent
To obtain consent to sever a portion of each property to create a new building lot between the two existing properties.
130 m away · filed Jan 10, 2022 · Approved
1 Talwood Dr · Consent
To obtain consent to sever a portion of each property to create a new building lot between the two existing properties.
140 m away · filed Jan 10, 2022 · Approved
1 Talwood Dr · Minor variance
Proposal to construct a two storey detached single family dwelling with an integral garage.
140 m away · filed Jan 10, 2022 · Approved
1 Talwood Dr · Minor variance
Proposal to construct a two storey detached single family dwelling with an integral garage.
140 m away · filed Jan 10, 2022 · Approved
1 Talwood Dr · Minor variance
Proposal to construct a two storey detached single family dwelling with an integral garage.
140 m away · filed Jan 10, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.