Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

241 Franklin Ave

The City of Toronto has 15 building permits since 2017 (1 still open) and 3 Committee of Adjustment files on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services

    Drain - Proposal to convert existing garage and add a second floor to create a laneway suite

    Applied Aug 1, 2025 · issued Aug 7, 2025 · completed Apr 24, 2026 · Permit 22 149885 DRN

    Closed
  • Plumbing

    Plumbing - Proposal to convert existing garage and add a second floor to create a laneway suite

    Applied Jul 28, 2025 · issued Jul 28, 2025 · completed Apr 24, 2026 · Permit 22 149885 PLB

    Closed
  • Small residential project · Party wall admin permits

    Party wall admin permit pertaining to 239 Franklin, folder # 25 113562 BLD 00 SR

    Applied Feb 6, 2025 · issued Feb 10, 2025 · completed May 1, 2025 · Permit 25 113578 BLD

    Closed
  • Small residential project · Party wall admin permits

    Party wall admin permit pertaining to 239 Franklin Ave. folder # 25 108757 BLD

    Applied Jan 24, 2025 · completed Jan 29, 2025 · Permit 25 108754 BLD

    Cancelled
  • Heating and ventilation

    HVAC - Proposal to convert existing garage and add a second floor to create a laneway suite

    Applied Aug 3, 2023 · issued Sep 14, 2023 · completed Apr 24, 2026 · Permit 22 149885 HVA

    Closed
  • Small residential project · New laneway / rear yard suite

    Proposal to convert existing garage and add a second floor to create a laneway suite

    Applied May 20, 2022 · issued Sep 14, 2023 · 1 home added · Permit 22 149885 BLD

    Inspections under way
  • Small residential project · Other

    Proposal to convert the basement in to a new dwelling unit

    Applied Nov 4, 2020 · completed May 18, 2022 · 1 home added · Permit 20 214900 BLD

    Cancelled
  • Small residential project · Second suite (New)

    Revise to split Unit 1 into 2 smaller untis: Unit 1 located on the ground floor only and create new Unit 3 in the basement. Original proposal is to relocate existing stairs, convert existing attic space into 3rd floor studio, new interior layout and convert exisitng 2-1/2 sfd townhouse into 3 storey townhouse with secondary suite.

    Applied Dec 18, 2018 · completed Feb 8, 2019 · 2 homes added · Permit 18 199620 BLD (revision 01)

    Cancelled
  • Heating and ventilation

    HVAC - Relocate existing stairs, convert existing attic space into 3rd floor studio, new interior layout. CONVERT EXISTING 2-1/2 TOWNHOUSE INTO 3 STOREY TOWNHOUSE WITH SECONDARY SUITE

    Applied Sep 26, 2018 · issued Sep 28, 2018 · completed Jan 31, 2019 · Permit 18 199620 HVA

    Closed
  • Plumbing

    Plumbing - Relocate existing stairs, convert existing attic space into 3rd floor studio, new interior layout. CONVERT EXISTING 2-1/2 TOWNHOUSE INTO 3 STOREY TOWNHOUSE WITH SECONDARY SUITE

    Applied Jul 26, 2018 · issued Sep 11, 2018 · completed Jan 31, 2019 · Permit 18 199620 PLB

    Closed
  • Drains and site services

    Drain - Relocate existing stairs, convert existing attic space into 3rd floor studio, new interior layout. CONVERT EXISTING 2-1/2 TOWNHOUSE INTO 3 STOREY TOWNHOUSE WITH SECONDARY SUITE

    Applied Jul 26, 2018 · issued Sep 11, 2018 · completed Jan 31, 2019 · Permit 18 199620 DRN

    Closed
  • Small residential project · Second suite (New)

    Relocate existing stairs, convert existing attic space into 3rd floor studio, new interior layout. CONVERT EXISTING 2-1/2 TOWNHOUSE INTO 3 STOREY TOWNHOUSE WITH SECONDARY SUITE

    Applied Jul 25, 2018 · issued Sep 11, 2018 · completed Feb 8, 2019 · 1 home added · Permit 18 199620 BLD

    Closed
Show 3 more permits
  • Plumbing

    Plumbing - Underpinning existing footing 52.47 linear metres.

    Applied Jan 16, 2018 · issued Jan 19, 2018 · completed Jan 31, 2019 · Permit 18 105543 PLB

    Closed
  • Drains and site services

    Drain - Underpinning existing footing 52.47 linear metres.

    Applied Jan 16, 2018 · issued Jan 19, 2018 · completed Jan 31, 2019 · Permit 18 105543 DRN

    Closed
  • Small residential project · Underpinning

    Underpinning existing footing 52.47 linear metres.

    Applied Jan 16, 2018 · issued Jan 19, 2018 · completed Jan 31, 2019 · Permit 18 105543 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To convert the existing one-storey ancillary building (detached garage in the rear yard, abutting the laneway) into a laneway suite by constructing a second storey addition.

    Decision: Approved (hearing Mar 22, 2023)

    Filed Jul 3, 2022 · File A0771/22TEY

    Closed
  • Minor variance · R addition

    To convert the existing two-and-one-half-storey, two-unit townhouse to a two-and-one-half-storey, three-unit townhouse by converting the basement to a secondary suite.

    Decision: Refused (hearing Nov 3, 2021)

    Filed Jul 14, 2021 · File A0920/21TEY

    Closed
  • Minor variance · Other

    To alter the existing 2 ½-storey townhouse containing one dwelling unit by creating a second dwelling unit.

    Decision: Approved (hearing Jun 27, 2018)

    Filed Jan 26, 2018 · File A0100/18TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 249 Franklin Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with a deck. The existing rear ground level partial addition will be demolished.

    10 m away · filed May 19, 2024 · Approved

  • 20 Hugo Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a partial ground floor side (east) addition, and a second storey rear addition (cantilevered over the existing one-storey portion of the building). The existing one-storey ancillary building (detached garage, in the rear yard, abutting the laneway) will be maintained and unaltered.

    80 m away · filed Apr 16, 2024 · Approved

  • 9 Hugo Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a front one-storey addition (enclosing the front covered porch into habitable space), and a rear second storey addition.

    90 m away · filed Feb 13, 2024 · Approved

  • 38 Hugo Ave · Minor variance

    To construct a second storey on the existing rear ancillary building (detached garage) and convert it into a two-storey laneway suite. The existing parking spaces within the ground floor of the garage will be removed. The existing two-storey detached main dwelling on the lot will remain unaltered.

    50 m away · filed Nov 15, 2023 · Withdrawn

  • 55 Osler St · Minor variance

    To permit a rear two-storey addition.

    200 m away · filed Feb 14, 2023 · Approved

  • 1650 Dupont St · Minor variance

    To construct a new six-storey mixed-use building containing 28 residential units and 2 ground floor commercial units (retail). The existing sporting club will be demolished.

    220 m away · filed Jan 20, 2022 · Approved

  • 1611 Dupont St · Minor variance

    To convert the existing two-storey mixed-use building into an eating establishment on the ground and basement levels and office space on the second storey. Also, to construct a rear basement addition, a rear ground-level outdoor patio and a rear second-storey deck. The existing ground-level commercial unit and second-storey residential unit will be removed.

    200 m away · filed Nov 22, 2021 · Approved

  • 1540 Dupont St · Minor variance

    To alter the existing two-storey mixed-use building with two residential units by adding a third and partial fourth storey (mezzanine) to accomodate two additional residential units, new side wall openings (pedestrian doors, garage door and windows), a rear second storey deck, and terraces located on the second and fourth storey. The altered mixed-use building will contain one commercial unit and four residential units. No parking spaces will be provided for this proposal.

    200 m away · filed Jun 2, 2021 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.