Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

242 Milan St

The City of Toronto has 3 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Interior alterations

    Proposal for interior alterations on all floors.

    Applied Feb 18, 2016 · issued Feb 23, 2016 · Permit 16 117811 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for interior alterations on all floors.

    Applied Feb 18, 2016 · issued Feb 23, 2016 · Permit 16 117811 PLB

    Inspections under way
  • Heating and ventilation · Alter: Boiler/Furnace/AC replacement

    Proposal to replace furnace, A/C and additional ductwork in existing townhouse.

    Applied Jan 19, 2016 · issued Jan 28, 2016 · Permit 16 105833 MSA

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 285 Shuter St · Minor variance

    240 m away · filed May 22, 2026 · Postponed

  • 320 Ontario St · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition with a ground floor covered deck. The existing rear one-storey addition and rear deck will be demolished.

    240 m away · filed Apr 10, 2025 · Approved

  • 401 Dundas St E · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 770-2023), for a new 14-storey mixed-use building, by increasing the gross floor area, and building height.

    100 m away · filed Apr 18, 2024 · Approved

  • 394 Dundas St E · Minor variance

    To permit the existing two-storey rowhouse into a rooming house (a total of 5 suites) through interior alterations. Also, to maintain the existing rear one-storey ancillary building (detached garage), in the rear yard, abutting the laneway.

    150 m away · filed Aug 14, 2023 · Approved

  • 272 Berkeley St · Minor variance

    To permit three secondary suites (one within the basement, one on the second level, and one on the third level) in the existing semi-detached dwelling, which were constructed without an authorized building permit. Also, to permit a rear outdoor staircase, as well as a rear landing with stairs at the ground floor level. The existing rear deck and balconies will be demolished.

    180 m away · filed Jun 9, 2023 · Approved

  • 238 Berkeley St · Minor variance

    To construct a four-storey townhouse dwelling with a front integral garage, a front fourth floor balcony, a rear second floor deck, and rear Juliet balconies on the third and fourth floors.

    50 m away · filed Mar 10, 2023 · Approved

  • 238 Berkeley St · Minor variance

    To construct a four-storey townhouse dwelling with a front integral garage, a front fourth floor balcony, a rear second floor deck, and rear Juliet balconies on the third and fourth floors.

    50 m away · filed Mar 10, 2023 · Approved

  • 238 Berkeley St · Minor variance

    To construct a four-storey townhouse dwelling with a front integral garage, a front fourth floor balcony, a rear second floor deck, and rear Juliet balconies on the third and fourth floors.

    50 m away · filed Mar 10, 2023 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.