Toronto address · Ward 8, Eglinton-Lawrence
243 Glencairn Ave
The City of Toronto has 6 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Proposed demolition of existing SFD and construction of new 3 storey detached dwelling.
Applied Jul 25, 2025 · issued Aug 11, 2025 · Permit 23 189416 HVA
- Revision issued
New house · New building
Rev. 1- Minor alteration in wall height and dwelling heightProposed demolition of existing SFD and construction of new 3 storey detached dwelling.
Applied Mar 7, 2025 · issued May 13, 2025 · Permit 23 189416 BLD (revision 01)
- Inspections under way
Drains and site services
Drain - Proposed demolition of existing SFD and construction of new 3 storey detached dwelling.
Applied Sep 13, 2023 · issued Oct 2, 2023 · Permit 23 189416 DRN
- Inspections under way
Plumbing
Plumbing - Proposed demolition of existing SFD and construction of new 3 storey detached dwelling.
Applied Aug 15, 2023 · issued Oct 2, 2023 · Permit 23 189416 PLB
- Inspections under way
New house · New building
Proposed demolition of existing SFD and construction of new 3 storey detached dwelling.
Applied Aug 15, 2023 · issued Oct 2, 2023 · 1 home added · Permit 23 189416 BLD
- Closed
Demolition
Proposed demolition of existing SFD and construction of new 3 storey detached dwelling.
Applied Aug 15, 2023 · issued Oct 2, 2023 · completed Jan 29, 2025 · 1 home removed · Permit 23 189420 DEM
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
Proposal to construct a new 3 storey single family dwelling with integral garage and a cabana in the rear yard. Please note, this application was deferred July 28, 2022 to conduct revisions to plans.
Decision: Approved (hearing Nov 24, 2022)
Filed May 3, 2022 · File A0313/22NY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
285 Glencairn Ave · Minor variance
To construct a new two-storey detached dwelling with an integral garage, and a covered rear deck and balcony.
170 m away · filed Aug 20, 2026 · Hearing scheduled
258 Lytton Blvd · Minor variance
To construct a new dwelling.
220 m away · filed Feb 3, 2026 · Approved
4 Coldstream Ave · Minor variance
To construct a 2 storey rear addition and a new front wall box bay window.
90 m away · filed Feb 6, 2025 · Approved
24 Strathallan Blvd · Minor variance
To construct a new detached dwelling.
80 m away · filed Jan 24, 2025 · Closed
283 Glencairn Ave · Minor variance
To construct a new detached dwelling with an integral three car garage in the basement and one on the main floor with a car lift, front porch, rear second storey balcony, third storey side balcony and a rear yard Cabana and Swimming pool.
150 m away · filed Nov 28, 2024 · Approved
24 Strathallan Blvd · Minor variance
To construct a new two-storey detached dwelling with a front porch and rear covered patio.
80 m away · filed Nov 5, 2024 · Refused
184 Alexandra Blvd · Minor variance
To reconstruct and extend the existing deck, at the rear of the dwelling.
220 m away · filed May 15, 2024 · Approved
104 Strathallan Blvd · Minor variance
Proposal to construct a new dwelling.
190 m away · filed Jun 27, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.