Toronto address · Ward 14, Toronto-Danforth
243 Milverton Blvd
The City of Toronto has 4 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Addition(s)
Revision 01 - structural changesProposal for multiple projects to an existing 2 storey SFD-semi dwelling. Scope of work includes a 2 storey rear addition, interior alterations and new rear deck.
Applied Nov 16, 2018 · issued Dec 4, 2018 · completed Jul 3, 2019 · Permit 18 218456 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Proposal for multiple projects to an existing 2 storey SFD-semi dwelling. Scope of work includes a 2 storey rear addition, interior alterations and new rear deck.
Applied Sep 19, 2018 · issued Sep 28, 2018 · completed Jul 3, 2019 · Permit 18 218456 HVA
- Closed
Plumbing
Plumbing - Proposal for multiple projects to an existing 2 storey SFD-semi dwelling. Scope of work includes a 2 storey rear addition, interior alterations and new rear deck.
Applied Aug 31, 2018 · issued Sep 28, 2018 · completed Jul 3, 2019 · Permit 18 218456 PLB
- Closed
Small residential project · Addition(s)
Proposal for multiple projects to an existing 2 storey SFD-semi dwelling. Scope of work includes a 2 storey rear addition, interior alterations and new rear deck.
Applied Aug 31, 2018 · issued Sep 28, 2018 · completed Jul 3, 2019 · Permit 18 218456 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
14 storeys · 81 homes · Mixed use
500 m away · Site plan · Approved · filed Oct 1, 2024
Neighbours’ Committee of Adjustment files within 250 m
84 Linnsmore Cres · Minor variance
To alter the existing two-storey semi-detached dwelling by enclosing the front covered porch into habitable space (mudroom), with a new landing and staircase.
70 m away · filed Sep 10, 2026 · Hearing scheduled
111 Linsmore Cres · Minor variance
160 m away · filed Aug 20, 2026 · Accepted
99 Linnsmore Cres · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition, and complete third storey addition with a rear rooftop deck (above the second storey).
130 m away · filed Jun 2, 2026 · Approved
48 Queensdale Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with rear exterior stairs. The existing rear deck will be demolished.
220 m away · filed May 25, 2026 · Approved
2 Frankdale Ave · Minor variance
To construct a new three-storey detached dwelling (basement level is considered the first storey) with an integral garage, a front covered porch with stairs, a front second and third floor extended roof, and a rear second floor deck with stairs.
250 m away · filed May 12, 2025 · Approved
2 Frankdale Ave · Minor variance
To construct a new three-storey detached dwelling (basement level is considered the first storey) with an integral garage, a front covered porch with stairs, a front second and third floor extended roof, and a rear second floor deck with stairs.
250 m away · filed May 12, 2025 · Approved
2 Frankdale Ave · Consent
To obtain consent to sever the property into two residential lots.
250 m away · filed Feb 11, 2025 · Approved
932 Greenwood Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a complete second storey addition (cantilevered at the front), a rear two storey addition, a new covered front porch with stairs (the existing front porch will be demolished), a front second storey balcony, and a rear ground floor deck. Also, to construct a front yard parking pad.
170 m away · filed Aug 7, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.