Toronto address · Ward 14, Toronto-Danforth
245 Dewhurst Blvd N
The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Interior alteration to existing dwelling, one storey rear addition, second storey addition, basement walkout, deck and covered porch
Applied Jul 24, 2017 · issued Aug 17, 2017 · completed Nov 15, 2018 · Permit 17 204214 HVA
- Closed
Plumbing
Plumbing - Interior alteration to existing dwelling, one storey rear addition, second storey addition, basement walkout, deck and covered porch
Applied Jul 24, 2017 · issued Aug 17, 2017 · completed Nov 15, 2018 · Permit 17 204214 PLB
- Closed
Small residential project · Multiple projects
Interior alteration to existing dwelling, one storey rear addition, second storey addition, basement walkout, deck and covered porch
Applied Jul 24, 2017 · issued Aug 17, 2017 · completed Nov 15, 2018 · Permit 17 204214 BLD
- Closed
Drains and site services
Drain - Interior alteration to existing dwelling, one storey rear addition, second storey addition, basement walkout, deck and covered porch
Applied Jul 24, 2017 · issued Aug 17, 2017 · completed Nov 2, 2018 · Permit 17 204214 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter a bungalow by constructing a second floor and a two-storey rear addition including a deck and a parking pad. Interior alterations will be completed throughout the dwelling.
Decision: Approved (hearing Jun 14, 2017)
Filed Feb 15, 2017 · File A0186/17TEY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
270 Floyd Ave · Consent
To obtain consent to sever the merged property into three residential lots.
220 m away · filed Dec 10, 2024 · Approved
190 Donlands Ave · Consent
To obtain consent to sever a portion of land for the purpose of a lot addition.
150 m away · filed May 14, 2024 · Application withdrawn
169 Woodycrest Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a new front porch, which will be enclosed and to reconstruct the front stairs.
200 m away · filed Sep 7, 2023 · Approved
190 Donlands Ave · Minor variance
To construct a new two-storey semi-detached ancillary building (containing one laneway suite with a rear [west] second storey juliette balcony), in the rear yard, abutting the laneway and Kings Park Boulevard. The existing ancillary building (semi-detached garage) in the rear yard, will be demolished. Also, the existing two-storey detached main dwelling will be maintained and unaltered.
150 m away · filed Aug 21, 2023 · Approved
188 Donlands Ave · Minor variance
To construct a new two-storey semi-detached ancillary building (containing one laneway suite with a rear [west] second storey juliette balcony), in the rear yard, abutting the laneway. The existing ancillary building (semi-detached garage) in the rear yard, will be demolished. Also, the existing two-storey detached main dwelling will be maintained and unaltered.
150 m away · filed Aug 21, 2023 · Approved
188 Donlands Ave · Consent
To obtain consent to sever the property into two residential lots and to maintain an existing easement/right-of-way.
150 m away · filed Aug 21, 2023 · Approved
323 Mortimer Ave · Minor variance
To maintain the existing three-storey semi-detached dwelling.
60 m away · filed Apr 14, 2023 · Approved
323 Mortimer Ave · Consent
To obtain consent to sever a portion of the land for the purpose of a lot addition.
60 m away · filed Apr 14, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.