Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

2454 Yonge St

The City of Toronto has 7 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Designated structure · Sign building permit related

    Application for a permit to erect and display one illuminated projecting sign.*****BMO*****

    Applied Aug 23, 2021 · issued Sep 13, 2021 · completed Mar 8, 2023 · Permit 21 202721 DST

    Cancelled
  • Designated structure · Sign building permit related

    To erect and display two illuminated wall signs.****BMO****

    Applied Jan 21, 2021 · issued Mar 31, 2021 · completed Feb 1, 2022 · Permit 21 107231 DST

    Closed
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Interior alterations to convert retail store to bank, work includes structural, plumbing, hvac and new fire alarm system - BMO Branch

    Applied Nov 30, 2020 · issued May 3, 2022 · completed May 3, 2022 · Permit 20 206077 FSU

    Closed
  • Addition or alteration · Interior alterations

    Interior alterations to convert retail store to bank, work includes structural, plumbing, hvac and new fire alarm system - BMO Branch

    Applied Oct 14, 2020 · issued Dec 2, 2020 · completed May 9, 2022 · Permit 20 206077 BLD

    Closed
  • Heating and ventilation

    HVAC - Interior alterations to convert retail store to bank, work includes structural, plumbing, hvac and new fire alarm system - BMO Branch

    Applied Oct 14, 2020 · issued Dec 2, 2020 · completed Nov 5, 2021 · Permit 20 206077 HVA

    Closed
  • Plumbing

    Plumbing - Interior alterations to convert retail store to bank, work includes structural, plumbing, hvac and new fire alarm system - BMO Branch

    Applied Oct 14, 2020 · issued Dec 2, 2020 · completed Nov 2, 2021 · Permit 20 206077 PLB

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install Backflow Prevention Device.

    Applied Oct 6, 2020 · issued Nov 4, 2020 · completed Nov 6, 2020 · Permit 20 203601 PSA

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 74 Roselawn Ave · Minor variance

    To construct a new three-storey detached dwelling. File Nos. B0015/26NY, A0262/26NY and A0263/26NY will be jointly considered.

    170 m away · filed Jun 30, 2026 · Tentatively scheduled

  • 74 Roselawn Ave · Consent

    To obtain consent to sever the existing property into 2 residential lots and construct 2 new three-storey dwellings. File numbers B0015/26NY, A0262/26NY. and A0263/26NY will be jointly considered.

    170 m away · filed Jun 30, 2026 · Tentatively scheduled

  • 74 Roselawn Ave · Minor variance

    To construct a three-storey detached dwelling. File Nos. B0015/26NY, A0262/26NY and A0263/26NY will be jointly considered.

    170 m away · filed Jun 30, 2026 · Tentatively scheduled

  • 47 Roselawn Ave · Minor variance

    To permit an office use at the existing dwelling, with a second storey east to west addition linking to 49 Roselawn Avenue.

    110 m away · filed Jul 31, 2024 · Approved

  • 49 Roselawn Ave · Minor variance

    To permit an office use at the existing dwelling, with a second storey east to west addition linking to 47 Roselawn Avenue.

    120 m away · filed Jul 31, 2024 · Approved

  • 2400 Yonge St · Minor variance

    To alter the developments standards, as approved by Site Specific Zoning By-law 1207-2022, including changes to the tower heights, gross floor area, and parking space lengths. The southern tower will increase from 101.2 metres to 110.1 metres and the north tower will increase 83.2 metres to 92.1 metres.

    80 m away · filed Feb 8, 2024 · Approved

  • 40 Broadway Ave · Minor variance

    To permit an additional 4 storeys on top of the previously approved 39-storey tower. Cross-reference Site Plan Control Application 22 132571 NNY 15 SA. NOTE: This application was previously deferred at the Committee of Adjustment hearing on January 23, 2025.

    240 m away · filed Jul 18, 2023 · Approved

  • 87 St Clements Ave · Minor variance

    Proposal to construct a new dwelling.

    250 m away · filed Jun 19, 2023 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.