Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 11, University-Rosedale

247 Borden St

The City of Toronto has 2 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    install BWV

    Applied Aug 12, 2021 · issued Sep 17, 2021 · completed Sep 29, 2021 · Permit 21 197656 DRN

    Closed
  • Small residential project · Party wall admin permits

    Part wall admin permit for work at 245 Borden St

    Applied Aug 18, 2017 · issued Aug 25, 2017 · completed Jul 19, 2024 · Permit 17 218959 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 511 Bloor St W · Minor variance

    To permit the existing partially covered outdoor patio (abutting Borden Street), for the use of the eating establishment within the existing two-and-one-half-storey mixed-use building.

    100 m away · filed Jul 16, 2026 · Hearing scheduled

  • 225 1/2 Borden St · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a front covered porch with stairs.

    60 m away · filed Jan 12, 2026 · Approved

  • 240 Major St · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear second storey addition with a balcony above the existing rear one-storey portion of the dwelling. Also, to permit the existing habitable space within the attic, which was converted without an authorized building permit.

    170 m away · filed Jan 7, 2026 · Approved

  • 537 Bloor St W · Minor variance

    To alter the existing two-storey non-residential building by constructing front and rear ground floor additions. The ground floor will be converted into one restaurant use space. The existing office space, and dental office space, located on the second floor, will be maintained.

    170 m away · filed Apr 7, 2025 · Approved

  • 325 Brunswick Ave · Minor variance

    To alter the existing three-storey semi-detached dwelling by constructing a third storey dormer, and to convert from two residential dwelling units into three residential dwelling units. Also, to construct a rear exterior staircase to acess the second and third levels, as well as an additional staircase to acess ground level.

    240 m away · filed Feb 28, 2025 · Withdrawn

  • 492 Bloor St W · Minor variance

    To permit a restaurant use (occupying the basement and ground levels of the existing three-storey mixed-use building). The existing residential dwelling unit (occupying the second and third levels) will be maintained and unaltered.

    180 m away · filed Nov 8, 2024 · Approved

  • 256 Major St · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a new covered front porch, a second storey addition with a ground floor deck, and a third storey addition with a rear balcony (above the second floor). The existing front porch and front second floor balcony will be demolished.

    150 m away · filed Sep 16, 2024 · Application withdrawn

  • 374 Lippincott St · Minor variance

    To construct a new two-storey ancillary building (containing a one car garage on the ground level, storage use on the second level, and a front cantilevered green roof) in the rear yard, abutting the laneway. There will be a total of one residential dwelling unit (within the main house) on this lot.

    170 m away · filed May 30, 2024 · Approved

Everything planned in University-Rosedale

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.