Toronto address · Ward 9, Davenport
247 Sterling Rd
The City of Toronto has 4 building permits since 2017 and 2 Committee of Adjustment files on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Multiple projects
Revision 01- to extent ground floor mudroom and propose second floor addition (10.22m2) as per COA decision. Underpin and bench existing basement - 28 linear metres. Interior alterations; (82m2) reconstruct rear mudroom foundation. Rear ground floor deck. SFD semi
Applied Oct 2, 2019 · issued Oct 23, 2019 · completed Jun 17, 2020 · Permit 19 173899 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Interior alterations; (82m2) reconstruct rear mudroom foundation. Rear ground floor deck. SFD semi
Applied Jul 24, 2019 · issued Jul 30, 2019 · completed Jun 16, 2020 · Permit 19 173899 HVA
- Closed
Plumbing
Plumbing - Interior alterations; (82m2) reconstruct rear mudroom foundation. Rear ground floor deck. SFD semi
Applied Jun 27, 2019 · issued Jun 28, 2019 · completed Jun 16, 2020 · Permit 19 173899 PLB
- Closed
Small residential project · Interior alterations
Interior alterations; (82m2) reconstruct rear mudroom foundation. Rear ground floor deck. SFD semi
Applied Jun 18, 2019 · issued Jun 21, 2019 · completed Jun 17, 2020 · Permit 19 173899 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
Revision 01- to extent ground floor mudroom and propose second floor addition (10.22m2) as per COA decision. Underpin and bench existing basement - 28 linear metres.
Decision: Withdrawn
Filed Nov 15, 2019 · File A1171/19TEY
- Closed
Minor variance · R addition
To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition.
Decision: Approved (hearing Sep 26, 2019)
Filed Jun 19, 2019 · File A0667/19TEY
What’s planned nearby
Development sites within 500 m
- Under review
19 storeys · 325 homes · Mixed use
90 m away · Condominium · Under review · filed Nov 8, 2021
- Under review
1423-1437 Bloor Street West and 278 Sterling Road
18 storeys · 197 homes · Mixed use
130 m away · Site plan · Under review · filed Aug 20, 2021
- Approved
18 storeys · 262 homes · Residential
130 m away · Site plan · Approved · filed Oct 15, 2021
- Under review
11 storeys · Non-residential
160 m away · Site plan · Under review · filed Aug 15, 2022
- Approved
33 storeys · 377 homes · Residential
190 m away · Rezoning · Approved · filed Dec 24, 2025
- Under review
21 storeys · 861 homes · Residential
210 m away · Site plan · Under review · filed Nov 7, 2024
Neighbours’ Committee of Adjustment files within 250 m
83 Perth Ave · Minor variance
To legalize and to maintain the rear second floor addition (conversion of the existing rear second floor deck into habitable space) and the rear dormer third floor addition that were constructed without an authorized building permit. Also, to permit the reconstruction of a rear third floor rooftop deck (previously constructed without an authorized building permit and since removed).
100 m away · filed Aug 2, 2024 · Approved
230 Sterling Rd · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a rear two-storey addition. The existing rear basement walkout stairs, rear ground floor concrete pad, and a portion of the rear ground floor deck will be demolished.
70 m away · filed Aug 1, 2024 · Approved
72 Perth Ave · Minor variance
To alter the development standards for a new rental building (approved under Site Specific Zoning By-law 182-2022, as amended by City Wide By-law 569-2013, and Minor Variance Decision A0892/22TEY) by increasing the building height from 11 to 16 storeys, reducing the ground floor height, increasing the residential density, increasing the number of residential units from 128 to 211 units, amending the building setbacks/stepbacks and reducing the loading space provisions on site. The existing vacant two-story building (previously used as a place of worship) will be demolished.
110 m away · filed Feb 23, 2024 · Approved
59 Perth Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a partial third storey addition (within the attic), a rear two-storey addition with a second storey balcony and a rooftop deck (accessed from the third storey). There will be two residential dwelling units on this lot.
70 m away · filed Jan 8, 2024 · Approved
1423 Bloor St W · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 927-2022 for an 18-storey mixed-use building with a 6-storey podium, and one level of underground parking) by constructing two additional storeys, increasing the overall building height and residential gross floor area.
110 m away · filed Jul 5, 2023 · Approved
72 Perth Ave · Minor variance
To permit the increase in dwelling units (from 108 units to 128 units)and the overall building height in order to incorporate a geothermal heating and cooling system provided within the 11-storey mixed-use building, currently under review by Site Plan Control Application (File Number 21 226455 STE 09 SA).
110 m away · filed Aug 8, 2022 · Approved
228 Sterling Rd · Minor variance
To alter the existing two-storey townhouse dwelling by rebuilding the existing front basement walkout. In total, there will be one primary unit and two secondary suites within this dwelling.
80 m away · filed Mar 22, 2022 · Approved
29 Perth Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a first storey side addition (integral garage). This proposal was previously approved through Minor Variance application A0148/22TEY, but was missing the two Minor Variances in this application.
100 m away · filed Jan 28, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.