Toronto address · Ward 19, Beaches-East York
2489 Queen St E
The City of Toronto has 6 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Addition or alteration · Multiple projects
REVISION - Removal of planned vertical support beams, Smaller size swim spa and adjusted layout, Change of contractor and engineer for rooftop workProposing 2nd floor residential interior alterations, and a new rooftop amenity space
Applied May 26, 2025 · issued Jun 12, 2025 · completed Jul 11, 2025 · Permit 24 146336 BLD (revision 01)
- Closed
Addition or alteration · Multiple projects
Proposing 2nd floor residential interior alterations, and a new rooftop amenity space
Applied May 9, 2024 · issued Sep 18, 2024 · completed Jul 11, 2025 · 1 home added · Permit 24 146336 BLD
- Closed
Addition or alteration · Interior alterations
Revision 01 - Relocation of residential exterior door to the face of the building. Relocation of thecommercial entrance to the face of the building. The exterior storefront to be flush to theexisting brick wall.Proposed interior alterations to existing basement by altering location of bathrooms and utility room.
Applied Jan 20, 2023 · issued Feb 23, 2023 · completed Jul 18, 2023 · Permit 22 167296 BLD (revision 01)
- Refusal notice
Heating and ventilation
HVAC - Proposed interior alterations to existing basement by altering location of bathrooms and utility room.
Applied Sep 6, 2022 · Permit 22 167296 HVA
- Closed
Plumbing
Plumbing - Proposed interior alterations to existing basement by altering location of bathrooms and utility room.
Applied Jun 29, 2022 · issued Sep 6, 2022 · completed Jul 14, 2023 · Permit 22 167296 PLB
- Closed
Addition or alteration · Interior alterations
Proposed interior alterations to existing basement by altering location of bathrooms and utility room.
Applied Jun 24, 2022 · issued Aug 24, 2022 · completed Jul 18, 2023 · Permit 22 167296 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
30 Kingswood Rd · Minor variance
To alter the existing four-storey detached dwelling by constructing a rear third storey and a fourth storey addition, a rear second storey covered deck with stairs, and a side (south) carport with two parking spaces.
200 m away · filed Jan 27, 2026 · Approved
20 Balmy Ave · Minor variance
To permit a front (south) yard parking pad (located on a private driveway that does not lead directly to a garage) and construct a driveway, abutting Balmy Avenue. Also, to construct a new front walkway.
180 m away · filed Jan 26, 2026 · Approved
6 Munro Park Ave · Minor variance
To alter the existing three-storey detached dwelling by constructing a front one-storey addition (partial front porch enclosure), a side (south) one-storey addition, a rear one-storey addition, and a rear third storey addition. The accessory structure (gym) in the rear yard is under construction as approved by Building Permit 24 201485 BLD 00 SR.
250 m away · filed Sep 23, 2024 · Approved
87 Neville Park Blvd · Consent
To obtain consent to create an easement/right-of-way.
90 m away · filed May 25, 2022 · Approved
44 Nursewood Rd · Minor variance
To construct a new three-storey detached dwelling with a front integral garage, a rear basement walkout, and rear second and third storey balconies.
50 m away · filed Mar 19, 2022 · Approved
44 Nursewood Rd · Minor variance
To construct a new three-storey detached dwelling with an integral garage,
50 m away · filed Nov 16, 2021 · Refused
18 Munro Park Ave · Minor variance
To construct a third storey addition with a rear rooftop deck to the existing dwelling.
210 m away · filed Jul 22, 2021 · Approved
2455 Queen St E · Minor variance
To convert the existing two-storey, mixed-use building containing retail uses on the ground floor and one dwelling unit at the second storey into a three-storey, mixed-use building containing retail uses on the ground floor and two dwelling units on the second and third stories by constructing: a rear second storey addition with a rear balcony; a full third storey addition with a rear balcony; and a rear staircase providing access to the second and third storeys.
150 m away · filed Dec 16, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.