Toronto address · Ward 1, Etobicoke North
25-55 Provence Trl
The City of Toronto has 7 building permits since 2017 (6 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Addition or alteration · Interior alterations
Structural support for proposed cooling system
Applied Apr 15, 2020 · issued May 15, 2020 · Permit 20 133566 BLD
- Inspections under way
Heating and ventilation · Alter: Boiler/Furnace/AC replacement
Proposal to install a cooling system in an existing apartment building.
Applied Nov 13, 2019 · issued May 15, 2020 · Permit 19 248688 MSA
- Permit issued
Addition or alteration · Other
Replace 3 landing slabs and stairs to front porch
Applied Nov 1, 2017 · issued Nov 3, 2017 · Permit 17 256524 BLD
- Permit issued
Addition or alteration · Other
Slab reconstruction to 2 stairs. Replace landing slab and stairs.
Applied Nov 1, 2017 · issued Nov 3, 2017 · Permit 17 256498 BLD
- Permit issued
Addition or alteration · Other
Replace slab and stairs to 2 front porches
Applied Nov 1, 2017 · issued Nov 3, 2017 · Permit 17 256531 BLD
- Permit issued
Addition or alteration · Other
Replace landing slab and stairs (3)
Applied Nov 1, 2017 · issued Nov 3, 2017 · Permit 17 256512 BLD
- Closed
Plumbing · Backflow prevention devices (Water only)
To install two backflow prevention devices (one for 25-35 Prevence Trail and other for 45-55 Provence Trail)
Applied Nov 9, 2009 · issued Dec 1, 2009 · completed Aug 21, 2026 · Permit 09 186719 PSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
19 Provence Trl · Minor variance
To construct two-storey front and rear additions.
20 m away · filed Apr 12, 2023 · Deferred
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.