Toronto address · Ward 11, University-Rosedale
25 Baldwin St
The City of Toronto has 2 Committee of Adjustment files on record for this address.
Building permits
The City lists no building permits for this address since 2017, and none still open from before.
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To construct a four-storey mixed-use building with a front third storey platform and a rooftop enclosure providing access to a front fifth storey platform.
Decision: Approved (hearing Jun 16, 2021)
Filed Nov 25, 2020 · File A1076/20TEY
- Closed
Minor variance · Other
To demolish the existing two storey front yard and one storey rear yard mixed use building and construct a new four storey mixed use building. The front yard façade will be retained for the first two floors. The new building includes a rooftop terrace, a rooftop access enclosure, and a third floor rear terrace.
Decision: Withdrawn (hearing Jan 1, 2020)
Filed Jun 17, 2019 · File A0639/19TEY
What’s planned nearby
Development sites within 500 m
- Under review
18 storeys · Non-residential
250 m away · Site plan · Under review · filed Jun 1, 2022
- Approved
- Under review
Not stated in the file
290 m away · Subdivision · Under review · filed Nov 5, 2021
- Under review
64 storeys · 579 homes · Mixed use
290 m away · Site plan · Under review · filed Aug 17, 2022
- Under review
191-199 College Street and 74-76 Henry Street
31 storeys · 492 homes · Mixed use
340 m away · Site plan · Under review · filed Aug 28, 2022
- Under review
61 storeys · 475 homes · Residential
370 m away · Site plan · Under review · filed Sep 1, 2021
Neighbours’ Committee of Adjustment files within 250 m
292 Dundas St W · Consent
To obtain consent to create new easements/rights-of-way.
240 m away · filed Jan 26, 2026 · Approved
292 Dundas St W · Minor variance
To alter the parking length standard for one residential parking space (Unit 11) on Parking Level 1 of the 32-storey mixed-use building, containing three levels of below grade parking.
240 m away · filed Jan 9, 2026 · Approved
150 Beverley St · Minor variance
To alter the existing three-storey mixed-use building by converting the existing office space (Unit 1 located within the basement at the southern portion of the building) into medical office space with accessory uses.
200 m away · filed Jul 17, 2025 · Approved
28 D'Arcy St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a complete third storey addition, and a new rear three-storey addition (with a basement walkout level). Also, to construct a rear exterior staircase that will access each level. There will be a total of 4 residential dwelling units on this lot. The existing rear two-storey ancillary building will be maintained and unaltered.
70 m away · filed Dec 31, 2024 · Approved
202 Beverley St · Minor variance
To alter the existing three-storey detached dwelling by constructing a rear one-storey addition over the existing ground floor deck.
190 m away · filed Nov 6, 2024 · Postponed
292 Dundas St W · Consent
To obtain consent to a stratified severance into three separate ownerships and to create various easements/rights-of-ways within the 32-storey mixed-use redevelopment. Also, to maintain existing easements/rights-of-way.
240 m away · filed Oct 11, 2024 · Approved
41 D'Arcy St · Consent
To obtain consent to sever the property into two residential lots.
130 m away · filed Feb 7, 2024 · Approved
133 Beverley St · Minor variance
The existing 4 residential buildings (consisting of two detached dwellings and two pairs of semi-detached dwellings, with varying heights, and a total of 27 dwelling units and 11 dwelling rooms) will be maintained and unaltered.
200 m away · filed Feb 7, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.