Toronto address · Ward 14, Toronto-Danforth
25 Boston Ave
The City of Toronto has 2 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Carport
Rev 1:REVISION TO BUILDING PERMIT #15 208453 BLD 00 SR:- REPAIR TO CARPORT FRAMING construct rear yard detached carport
Applied Nov 7, 2021 · issued Mar 8, 2024 · completed Jul 26, 2024 · Permit 15 208453 BLD (revision 01)
- Closed
Small residential project · Carport
construct rear yard detached carport
Applied Aug 18, 2015 · issued Sep 3, 2015 · completed Jul 26, 2024 · Permit 15 208453 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To legalize and to maintain the existing ancillary structure (carport) at the rear of the property, abutting the laneway.
Decision: Approved (hearing Jan 24, 2024)
Filed Nov 9, 2023 · File A0996/23TEY
What’s planned nearby
Development sites within 500 m
- Approved
9 storeys · 78 homes · Mixed use
250 m away · Site plan · Approved · filed May 3, 2023
Neighbours’ Committee of Adjustment files within 250 m
27 Brooklyn Ave · Minor variance
240 m away · filed Aug 21, 2026 · Postponed
64 Brooklyn Ave · Minor variance
To alter the existing three-storey detached dwelling by constructing one, two, and three-storey additions along the entire portion of the south side wall (including a basement level, a front integral garage, an elevator and stairs, a rear walkout basement, and a rear second storey terrace).
230 m away · filed Apr 23, 2026 · Approved
929 Queen St E · Minor variance
To alter the development standards for the 9-storey mixed-use building (35 m in height to the top of the mechanical penthouse) containing commercial uses on the ground and mezzanine floors with side (west) second-floor terraces and a side (east) rooftop amenity terrace (approved under Site Specific Zoning By-Law 291-2024), by increasing the metric height of the first, second, sixth, and eighth storeys (by 0.7 m, 2.45 m, 0.5 m, and 0.4 m respectively), with a maximum building height of 35 m to the top of the ninth storey (excluding the mechanical penthouse). Also, to increase the total gross f…
230 m away · filed Apr 15, 2026 · Approved
188 Pape Ave · Minor variance
To construct a new one-storey detached ancillary building (containing a two-car garage), in the rear yard, abutting the laneway.
180 m away · filed Mar 2, 2026 · Approved
188 Pape Ave · Minor variance
To alter the existing two-storey detached dwelling by reconstructing a side (south) basement walkout, and to construct a rear two-storey addition with basement (replaces the existing one-storey). There will be a total of two residential dwelling units on the lot (one unit occupying the main dwelling and one unit occupying the laneway suite proposed as of right/not part of this application). The existing rear detached garage will be demolished.
180 m away · filed Jun 5, 2025 · Approved
14 Blong Ave · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony.
170 m away · filed Apr 22, 2025 · Approved
53 Boston Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear one-storey addition (with basement extension below), a rear ground floor deck with stairs (the existing rear deck and stairs will be demolished), and a rear basement walkout.
70 m away · filed Dec 3, 2024 · Approved
43 Boston Ave · Minor variance
To alter the existing two-storey rowhouse dwelling by constructing a new front basement walkout with stairs for the purposes of accommodating a secondary suite. Also, to reconstruct the rear ground level deck. There will be two dwellings on the lot (duplex).
50 m away · filed Sep 5, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.