25 Coady Ave

The City of Toronto has 3 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal for a 3rd floor addition to existing semi-detached single family dwelling.

    Applied Dec 4, 2017 · issued Feb 13, 2018 · completed Mar 15, 2022 · Permit 17 270656 HVA

    Cancelled
  • Plumbing

    Plumbing - Proposal for a 3rd floor addition to existing semi-detached single family dwelling.

    Applied Dec 4, 2017 · issued Feb 13, 2018 · completed Mar 15, 2022 · Permit 17 270656 PLB

    Cancelled
  • Small residential project · Addition(s)

    Proposal for a 3rd floor addition to existing semi-detached single family dwelling.

    Applied Dec 4, 2017 · issued Feb 13, 2018 · completed Mar 15, 2022 · Permit 17 270656 BLD

    Cancelled

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing two-storey semi-detached dwelling by constructing a third storey addition.

    Decision: Approved (hearing Sep 27, 2017)

    Filed May 24, 2017 · File A0603/17TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 27 Brooklyn Ave · Minor variance

    150 m away · filed Aug 21, 2026 · Postponed

  • 58 Jones Ave · Minor variance

    To construct a new detached four-storey apartment building (containing seven residential dwelling units) with a front entrance with stairs, a side (north) covered entrance with stairs, a rear ground floor entrance with stairs and a partially enclosed waste storage in the front yard. Also, to construct a rear detached two-storey ancillary building (containing one laneway suite) with a rear (west) covered entrance and one visitor parking space, abutting the laneway. Further, to construct a rear one-storey detached ancillary building (containing 12 bicycle parking spaces). There will be a total…

    100 m away · filed Jun 25, 2026 · Approved

  • 64 Brooklyn Ave · Minor variance

    To alter the existing three-storey detached dwelling by constructing one, two, and three-storey additions along the entire portion of the south side wall (including a basement level, a front integral garage, an elevator and stairs, a rear walkout basement, and a rear second storey terrace).

    240 m away · filed Apr 23, 2026 · Approved

  • 1105 Queen St E · Minor variance

    To legalize and to maintain two residential dwelling units (one unit within the basement level, and one unit located on the ground level), in the existing three-storey mixed-use building, which were constructed without an authorized building permit. The existing commercial space located on the ground floor (currently vacant) will be maintained. The two existing residential dwelling units located on the second and third levels will be maintained and unaltered. There will be a total of four residential dwelling units on this lot.

    180 m away · filed Nov 17, 2025 · Approved

  • 45 Jones Ave · Minor variance

    To legalize and maintain the existing rear two-storey addition, including a basement extension below with a walkout, a rear second floor balcony (above the garage), and side (north) exterior staircases (one leading to the ground level and one leading to the second level), which was constructed without an authorized building permit.This addition will be abutting the existing one-storey detached ancillary building (garage), will not be accessible through the main portion of the dwelling and will have separate accesses to each level. There will be one residential dwelling unit on this lot.

    110 m away · filed Jul 22, 2025 · Refused

  • 53 Bertmount Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition.

    110 m away · filed Apr 14, 2025 · Approved

  • 81 Coady Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition with a rear balcony. Also, to construct a new one-storey front enclosed porch (mudroom) with stairs.

    160 m away · filed Dec 30, 2024 · Approved

  • 23 Curzon St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with a ground floor deck and stairs.

    240 m away · filed Oct 16, 2024 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.