Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 19, Beaches-East York

25 Curity Ave

The City of Toronto has 23 building permits since 2017 (13 still open) and 5 Committee of Adjustment files on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Fire and security upgrade · Fire alarm

    Proposed fire alarm system

    Applied Jun 30, 2026 · issued Aug 6, 2026 · Permit 26 194269 FSU

    Permit issued
  • Drains and site services · Site service

    Site Service - new 200mm dia. domestic water line, new internal storm system (200mm-300mm dia. sewers, manholes, catch basins) - interior alterations to increase the floor area of the existing brewery, raise the roof and alterations to the exterior loading dock - Brunswick Bierworks

    Applied Apr 7, 2022 · issued Jun 9, 2022 · Permit 21 230206 STS

    Permit issued
  • Heating and ventilation

    Revision to HVAC - to raise the roof, plumbing, HVAC extension of the brewery into an existing space - Brunswick Bierworks

    Applied Apr 5, 2022 · issued Jun 2, 2022 · Permit 21 230206 HVA (revision 01)

    Revision issued
  • Addition or alteration · Multiple projects

    Revision to raise the roof, plumbing, HVAC extension of the brewery into an existing space - Brunswick Bierworks

    Applied Apr 5, 2022 · issued May 31, 2022 · Permit 21 230206 BLD (revision 01)

    Revision issued
  • Plumbing

    Revision to Plumbing - to raise the roof, plumbing, HVAC extension of the brewery into an existing space - Brunswick Bierworks

    Applied Apr 5, 2022 · issued Jun 2, 2022 · completed Oct 31, 2023 · Permit 21 230206 PLB (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to increase the floor area of the existing brewery, raise the roof and alterations to the exterior loading dock - Brunswick Bierworks

    Applied Oct 25, 2021 · issued Dec 6, 2021 · Permit 21 230206 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal for interior alterations to increase the floor area of the existing brewery, raise the roof and alterations to the exterior loading dock - Brunswick Bierworks

    Applied Oct 25, 2021 · issued Dec 6, 2021 · completed Oct 31, 2023 · Permit 21 230206 PLB

    Closed
  • Addition or alteration · Multiple projects

    Proposal for interior alterations to increase the floor area of the existing brewery, raise the roof and alterations to the exterior loading dock - Brunswick Bierworks

    Applied Oct 25, 2021 · issued Dec 2, 2021 · Permit 21 230206 BLD

    Inspections under way
  • Addition or alteration · Other

    To construct new outdoor uncovered patio as a complimentary use to existing brewery for adjoinging tasting area

    Applied Dec 8, 2020 · issued Feb 8, 2021 · completed Mar 5, 2021 · Permit 20 226931 BLD

    Closed
  • Plumbing · Manholes/Catch Basins/Sumps/Interceptors

    install 1 manhole on sewer line

    Applied May 3, 2019 · issued Jun 12, 2019 · Permit 19 148912 PSA

    Inspections under way
  • Plumbing

    Plumbing - Proposal for interior alterations to create a tasting area for existing industrial building

    Applied Dec 14, 2018 · issued Feb 10, 2020 · completed Mar 18, 2020 · Permit 18 268740 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to create a tasting area for existing industrial building

    Applied Dec 14, 2018 · issued Feb 10, 2020 · Permit 18 268740 HVA

    Permit issued
Show 11 more permits
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to create a tasting area for existing industrial buildingTASTING AREA (A2 OCCUPANCY - 140 PERSONS)

    Applied Dec 14, 2018 · issued Feb 10, 2020 · Permit 18 268740 BLD

    Inspections under way
  • Plumbing

    Revision 2: Revision to the area of work as per cover letterRevision # 01 - Changes to mechanical system as per Mechanical Memorandum.Plumbing - Proposal for interior alterations to an existing industrial building. Scope of work includes demolition, new floors and ceiling.

    Applied Sep 27, 2016 · issued Oct 28, 2016 · completed Jan 2, 2026 · Permit 15 254487 PLB (revision 02)

    Closed
  • Addition or alteration · Interior alterations

    Revision 3: Area of revision indicated on the drawings and explain on the cover letter attached as correspondence Revision #02 - Revision as per the clouded areas on the attached drawings. Cover letter indicates the revised specifications. Revision # 01 - To the location of the original small roof cut out and sloped floor drainage below has been relocated. A new drainage and sloped floor has been added between gridlines Q and O, 14 and 15.Proposal for interior alterations to an existing industrial building. Scope of work includes demolition, new floors and ceiling.

    Applied Sep 27, 2016 · issued Jun 23, 2017 · Permit 15 254487 BLD (revision 03)

    Revision issued
  • Heating and ventilation

    Revision 2: Revision to area of work as per cover letterRevision # 01 - Changes to HVAC system as per Mechanical Memorandum.HVAC - Proposal for interior alterations to an existing industrial building. Scope of work includes demolition, new floors and ceiling.

    Applied Sep 27, 2016 · issued Oct 28, 2016 · completed Feb 4, 2020 · Permit 15 254487 HVA (revision 02)

    Closed
  • Addition or alteration · Interior alterations

    Revision #02 - Reivsion as per the clouded areas on the attached drawings. Coverletter indicates the revised specifications. Revision # 01 - To the location of the original small roof cut out and sloped floor drainage below has been relocated. A new drainage and sloped floor has been added between gridlines Q and O, 14 and 15.Proposal for interior alterations to an existing industrial building. Scope of work includes demolition, new floors and ceiling.

    Applied Jun 20, 2016 · issued Aug 29, 2016 · Permit 15 254487 BLD (revision 02)

    Revision issued
  • Addition or alteration · Interior alterations

    Revision # 01 - To the location of the original small roof cut out and sloped floor drainage below has been relocated. A new drainage and sloped floor has been added between gridlines Q and O, 14 and 15.Proposal for interior alterations to an existing industrial building. Scope of work includes demolition, new floors and ceiling.

    Applied Apr 13, 2016 · issued Feb 10, 2020 · Permit 15 254487 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    Revision # 01 - Changes to HVAC system as per Mechanical Memorandum.HVAC - Proposal for interior alterations to an existing industrial building. Scope of work includes demolition, new floors and ceiling.

    Applied Apr 13, 2016 · issued May 12, 2016 · completed Feb 4, 2020 · Permit 15 254487 HVA (revision 01)

    Closed
  • Plumbing

    Revision # 01 - Changes to mechanical system as per Mechanical Memorandum.Plumbing - Proposal for interior alterations to an existing industrial building. Scope of work includes demolition, new floors and ceiling.

    Applied Apr 13, 2016 · issued May 12, 2016 · completed Jan 2, 2026 · Permit 15 254487 PLB (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to an existing industrial building. Scope of work includes demolition, new floors and ceiling.

    Applied Nov 20, 2015 · issued Dec 23, 2015 · completed Feb 4, 2020 · Permit 15 254487 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to an existing industrial building. Scope of work includes demolition, new floors and ceiling.

    Applied Nov 20, 2015 · issued Dec 18, 2015 · Permit 15 254487 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for interior alterations to an existing industrial building. Scope of work includes demolition, new floors and ceiling.

    Applied Nov 20, 2015 · issued Dec 23, 2015 · completed Jan 2, 2026 · Permit 15 254487 PLB

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To install three new exterior liquid storage holding tanks on the property.

    Decision: Approved (hearing Apr 27, 2022)

    Filed Jan 7, 2022 · File A0082/22TEY

    Closed
  • Minor variance · Other

    To construct an outdoor patio on the north side of the existing brewery.

    Decision: Approved (hearing Sep 16, 2020)

    Filed Feb 18, 2020 · File A0189/20TEY

    Closed
  • Minor variance · Other

    To construct an outdoor patio for commercial use (event space/tasting area) related to the portion of the existing one-storey industrial building used as a brewery. The existing on-site parking is to be maintained.

    Decision: Withdrawn (hearing Jan 1, 2021)

    Filed Oct 31, 2019 · File A1122/19TEY

    Closed
  • Minor variance · Other

    To construct an outdoor patio for commercial use (event space/tasting area) related to the portion of the existing one-storey industrial building used as a brewery. The existing on-site parking is to be maintained.

    Decision: Withdrawn

    Filed May 24, 2019 · File A0555/19TEY

    Closed
  • Minor variance · Other

    To alter the existing manufacturing facility by permitting a commercial use comprised of a restaurant, an event space and an education centre, and by further reducing the minimum required parking standards. Minor Variance Decision A0333/16TEY permitted an increased lot coverage, open storage in the front yard, a reduced front yard setback, elimination of the required soft landscaping strip, a reduction of parking standards and brewing tanks located outside an enclosed building.

    Decision: Approved (hearing Aug 15, 2018)

    Filed Mar 1, 2018 · File A0223/18TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 39 Northdale Blvd · Minor variance

    To alter the existing two-storey detached dwelling by constructing a new rear one-storey addition with a ground floor deck and stairs. The existing rear one-storey addition and rear one-storey ancillary building (storage shed) will be demolished. The front yard parking space will be removed.

    170 m away · filed Jan 26, 2026 · Approved

  • 17 Eden Park Rd · Minor variance

    To construct a new two-storey detached dwelling with a front integral garage, a front covered porch, a rear ground floor deck, and a rear in-ground swimming pool. The existing one-storey ancillary building (detached garage in the rear yard) will be demolished.

    180 m away · filed Sep 27, 2024 · Approved

  • 35 Ashall Blvd · Minor variance

    To construct a new two-storey detached dwelling with a front integral garage, a north side covered porch with stairs, and a rear (east) ground floor deck.

    240 m away · filed Feb 15, 2024 · Approved

  • 59 Doris Dr · Minor variance

    To construct a two-storey ancillary building (garden suite with an attached garage and second storey deck) in the rear yard of the existing one-storey detached dwelling.

    250 m away · filed Jan 19, 2023 · Approved

  • 73 Denvale Rd · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two storey addition, a side two storey addition and a rear ground floor deck.

    230 m away · filed May 28, 2021 · Approved

  • 65 Glenshaw Cres · Minor variance

    To construct a new two-storey detached dwelling with an integral garage.

    90 m away · filed Nov 1, 2018 · Approved

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.