Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

25 Gordon St

The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposed construction of:1. REAR ADDITION (16.41 sq.m), 2. THIRD FLOOR ADDITION (59.75 sq.m), 3. UNDERPINNING (39.21 l.m); 4. INTERIOR ALTERATIONS (basement: 60 sq.m; ground: 60 sq.m; 2nd floor: 50 sq.m), 5. FRONT PORCH RENOVATION

    Applied Aug 27, 2024 · issued Sep 6, 2024 · completed Dec 19, 2024 · Permit 23 133969 HVA

    Closed
  • Drains and site services

    Drain - Proposed construction of:1. REAR ADDITION (16.41 sq.m), 2. THIRD FLOOR ADDITION (59.75 sq.m), 3. UNDERPINNING (39.21 l.m); 4. INTERIOR ALTERATIONS (basement: 60 sq.m; ground: 60 sq.m; 2nd floor: 50 sq.m), 5. FRONT PORCH RENOVATION

    Applied Nov 29, 2023 · issued Dec 6, 2023 · completed Dec 19, 2024 · Permit 23 133969 DRN

    Closed
  • Plumbing

    Plumbing - Proposed construction of:1. REAR ADDITION (16.41 sq.m), 2. THIRD FLOOR ADDITION (59.75 sq.m), 3. UNDERPINNING (39.21 l.m); 4. INTERIOR ALTERATIONS (basement: 60 sq.m; ground: 60 sq.m; 2nd floor: 50 sq.m), 5. FRONT PORCH RENOVATION

    Applied Apr 14, 2023 · issued Nov 10, 2023 · completed Apr 23, 2025 · Permit 23 133969 PLB

    Closed
  • Small residential project · Multiple projects

    Proposed construction of:1. REAR ADDITION (16.41 sq.m), 2. THIRD FLOOR ADDITION (59.75 sq.m), 3. UNDERPINNING (39.21 l.m); 4. INTERIOR ALTERATIONS (basement: 60 sq.m; ground: 60 sq.m; 2nd floor: 50 sq.m), 5. FRONT PORCH RENOVATION

    Applied Apr 14, 2023 · issued Nov 10, 2023 · completed May 14, 2025 · Permit 23 133969 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing two-storey townhouse dwelling by constructing a two-storey rear addition, a complete third storey addition, a new front porch and basement walkout, a rear third storey balcony, second and third storey front bay windows, and a side (west) basement walkout.

    Decision: Approved (hearing Dec 7, 2022)

    Filed Sep 15, 2022 · File A1017/22TEY

    Closed

What’s planned nearby

Development sites within 500 m

  • 450 Dufferin Street

    18 storeys · 176 homes · Mixed use

    160 m away · Site plan · Under review · filed Jun 30, 2025

    Under review
  • 1494-1502 Dundas Street West

    8 storeys · 57 homes · Mixed use

    380 m away · Site plan · Under review · filed Feb 15, 2023

    Under review
  • 1-3 Boland Lane and 646-648 Dufferin Street

    8 storeys · 135 homes · Residential

    430 m away · Condominium · Under review · filed Oct 12, 2021

    Under review
  • 6 Noble Street

    12 storeys · 169 homes · Mixed use

    440 m away · Condominium · Under review · filed Dec 16, 2021

    Under review
  • 31-33 Gladstone Avenue

    6 storeys · 28 homes · Residential

    450 m away · Site plan · Under review · filed Dec 10, 2021

    Under review
  • 1266 Queen Street West

    27 storeys · 362 homes · Mixed use

    460 m away · Site plan · Approved · filed Apr 21, 2023

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 450 Dufferin St · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-Law 254-2025) for a 18-storey mixed-use building (62 m in building height) by increasing the number of storeys and building height to 20-storeys (62.5 m), increasing the mechanical penthouse height from 67 m to 67.3 m, increasing the height projections of equipment and structures, increasing the permitted total gross floor area and residential gross floor area, as well as reducing the amenity space and bicycle parking rate. There will be a total of 197 rental residential dwelling units (6 affordable rental units), 3…

    170 m away · filed Nov 17, 2025 · Approved

  • 11 Bank St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing one and two-storey rear additions.

    110 m away · filed Oct 24, 2024 · Approved

  • 524 Dufferin St · Minor variance

    To alter the existing two- storey dwelling by demolishing the rear one-storey addition and constructing a new two-storey addition. Also, to construct a partial third storey addition with a rear balcony.

    80 m away · filed Aug 30, 2023 · Approved

  • 180 Gladstone Ave · Minor variance

    To permit the existing three-storey detached dwelling, which is currently under construction.

    240 m away · filed Apr 19, 2023 · Approved

  • 68 Florence St · Minor variance

    To alter the existing two-unit, two-and-one-half-storey townhouse by constructing a rear second storey addition and a new basement secondary suite.

    170 m away · filed Oct 7, 2022 · Approved

  • 6 Bank St · Minor variance

    To alter the existing three-storey semi-detached dwelling by reconstructing the existing enclosed front porch.

    160 m away · filed Apr 19, 2022 · Approved

  • 11 Sheridan Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a partial third storey addition and a three-storey rear addition with a rear third storey balcony.

    60 m away · filed Jan 27, 2022 · Approved

  • 11 Middleton St · Minor variance

    To replace the existing one-storey ancillary building with a new two-storey ancillary building (detached garage) in the rear yard (abutting the laneway). The ground level will contain one parking space and the second level will be used for storage.

    140 m away · filed Aug 31, 2021 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.