Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

25 Homewood Ave

The City of Toronto has 5 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Interior renovation to convert single family dwelling to a fourplex dwelling.

    Applied Nov 8, 2024 · issued Jan 28, 2025 · completed Feb 24, 2026 · Permit 24 236899 HVA

    Closed
  • Plumbing

    Plumbing - Interior renovation to convert single family dwelling to a fourplex dwelling.

    Applied Nov 8, 2024 · issued Jan 28, 2025 · completed Feb 24, 2026 · Permit 24 236899 PLB

    Closed
  • Small residential project · Multiple projects

    Proposal to construct interior alterations and a side(south) exit stair to convert existing semi detached SFD into a fourplex.

    Applied Nov 8, 2024 · issued Jan 28, 2025 · completed Mar 5, 2026 · Permit 24 236899 BLD

    Closed
  • Drains and site services

    Drain - Interior renovation to convert single family dwelling to a fourplex dwelling.

    Applied Nov 8, 2024 · issued Jan 28, 2025 · completed Mar 11, 2026 · Permit 24 236899 DRN

    Cancelled
  • Small residential project · Interior alterations

    Proposes interior alterations to convert existing semi-detached SFD to Triplex.

    Applied Jan 30, 2023 · completed Jul 7, 2025 · 2 homes added · Permit 23 108544 BLD

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 134 Carlton St · Minor variance

    To alter the existing three-storey apartment building (containing 35 rental dwelling units) by converting the basement level (storage rooms and building management office) and a portion of the ground floor (vacant space) into an additional 11 rental dwelling units. There will be a total of 46 rental dwelling units on this lot.

    140 m away · filed May 13, 2025 · Approved

  • 130 Carlton St · Minor variance

    To permit the reconstruction of the mezzanine in the residential dwelling unit (Penthouse #8), of the 15-storey residential building.

    200 m away · filed Dec 12, 2024 · Approved

  • 169 Carlton St · Minor variance

    To construct a one-storey ancillary structure (carport), in the rear yard, abutting the laneway (Doctor O Lane), for two parking spaces.

    220 m away · filed Oct 10, 2024 · Approved

  • 130 Carlton St · Minor variance

    To alter the existing 15-storey mixed-use building by constructing a new main entrance vestibule.

    200 m away · filed Apr 26, 2022 · Approved

  • 344 Jarvis St · Minor variance

    To alter the existing two-and-one-half-storey semi-detached rooming house by constructing a rear four-storey addition. A total of 26 rooms for living accommodation will be provided.

    240 m away · filed Sep 14, 2021 · Approved

  • 50 Bleecker St · Minor variance

    To construct a third storey addition (enclosed staircase) to provide access to the proposed rooftop deck for Unit 2.

    150 m away · filed Jun 24, 2021 · Refused

  • 96 Bleecker St · Minor variance

    To alter the existing 2½-storey townhouse by constructing a rear third storey addition with a balcony.

    180 m away · filed Jan 4, 2019 · Approved

  • 65 Homewood Ave · Minor variance

    To alter the existing pair of semi-detached single family dwellings by combining them into one building with a total of 16 dwelling units.

    130 m away · filed Mar 29, 2017 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.