Toronto address · Ward 13, Toronto Centre
25 Mutual St
The City of Toronto has 9 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Fire and security upgrade · Other
Proposal for replacement of existing electric fire pump and associated piping in fire pump room
Applied Nov 19, 2025 · issued Apr 7, 2026 · Permit 25 256213 FSU
- Closed
Addition or alteration · Interior alterations
Rev 01: revision to common areas for accessibility upgrades
Applied Jan 6, 2023 · issued Feb 1, 2023 · completed Feb 29, 2024 · Permit 22 109546 BLD (revision 01)
- Closed
Plumbing
Rev 01: revision to common areas for accessibility upgrades
Applied Jan 6, 2023 · issued Feb 1, 2023 · completed Nov 24, 2023 · Permit 22 109546 PLB (revision 01)
- Closed
Heating and ventilation
Rev 01: revision to common areas for accessibility upgrades
Applied Jan 6, 2023 · issued Feb 6, 2023 · completed Feb 23, 2024 · Permit 22 109546 HVA (revision 01)
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to the common areas of an existing apartment building. See also 21 244433 ZPR.
Applied Feb 1, 2022 · issued Mar 29, 2022 · completed Feb 23, 2024 · Permit 22 109546 HVA
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to the common areas of an existing apartment building. See also 21 244433 ZPR.
Applied Feb 1, 2022 · issued Mar 21, 2022 · completed Feb 29, 2024 · Permit 22 109546 BLD
- Closed
Plumbing
Plumbing - Proposal for interior alterations to the common areas of an existing apartment building. See also 21 244433 ZPR.
Applied Feb 1, 2022 · issued Mar 31, 2022 · completed Nov 24, 2023 · Permit 22 109546 PLB
- Closed
Plumbing · Fixtures/Roof Drains: other
Proposal to replace the fixtures in an existing apartment building.
Applied Aug 31, 2020 · issued Sep 21, 2020 · completed Dec 6, 2021 · Permit 20 187864 PSA
- Closed
Addition or alteration · Garage Repair/Reconstruction
Proposal for concrete garage repairs
Applied Jun 12, 2014 · issued Jul 11, 2014 · completed Jun 9, 2025 · Permit 14 172903 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
- Now selling
- Under review
119-127 Church Street and 83-89 Queen Street East
61 storeys · 691 homes · Mixed use
160 m away · Site plan · Under review · filed Aug 4, 2022
- Under review
32 storeys · 315 homes · Mixed use
170 m away · Rezoning · Under review · filed Mar 31, 2026
- Approved
50 storeys · 596 homes · Mixed use
220 m away · Rezoning · Approved · filed Nov 17, 2025
- Under review
59 storeys · 480 homes · Mixed use
230 m away · Site plan · Under review · filed Aug 18, 2022
Neighbours’ Committee of Adjustment files within 250 m
134 Jarvis St · Minor variance
To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.
50 m away · filed Sep 4, 2025 · Approved
53 Mutual St · Minor variance
To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.
130 m away · filed Jul 23, 2025 · Approved
225 Jarvis St · Minor variance
To alter the development standards of the 49-storey mixed-use building (as approved under Site Specific Zoning By-laws 764-2020(OMB) and 765-2020(OMB)) by increasing the total/residential gross floor area (from the first storey to the 20th storey). Also, to reduce the number of required parking spaces on-site. The total number of hotel suites (215 suites) and residential dwelling units (580 units) will be maintained.
240 m away · filed Mar 4, 2025 · Approved
75 Mutual St · Minor variance
To alter the existing three-storey detached building by constructing a fourth storey addition, and a rear four-storey addition. This building will contain a total of 18 dwelling rooms (multi-tenant house).
200 m away · filed Dec 9, 2024 · Approved
89 Church St · Minor variance
To permit a reduction in the number of required resident parking spaces and nine obstructed parking spaces, on-site.
250 m away · filed Nov 4, 2024 · Approved
203 Jarvis St · Consent
To obtain consent to a strata severance and to create various easements/rights-of-way.
170 m away · filed Sep 17, 2024 · Approved
90 Queen St E · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-laws 218-2021 and 219-2021), for a new 34-storey mixed-use building (which is currently under construction), by reducing the minimum number of vehicular parking spaces. There will be a total of 369 residential dwelling units on this lot.
70 m away · filed Aug 19, 2024 · Approved
225 Jarvis St · Minor variance
To permit access to the loading area of the 49-storey mixed-use building (as approved under Site Specific Zoning By-laws 764-2020(OMB) and 765-2020(OMB)) from the abutting street on the east side of the building (George Street). This mixed-use building will contain 215 hotel suites, one ground floor restaurant use, and 580 residential dwelling units.
240 m away · filed Jun 22, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.